Filter Search


Asia


Location Summary Deadline
India Supply Of Aluminum Profiles As Per Specified Drawings, Including A Warranty Period Of 30 Months Post-delivery. Al Profile 2026-01-19
Bangladesh Supplying Of Equipment Shelter Repair And Earthing & Grounding. 2026-01-19
India 1 1/4" Angle Cock With Vent For Bp/fp As Per Clw Drawing No. 0/2/65/386 Alt-6. .#* 1 1/4" Angle Cock With Vent For Bp/fp As Per Clw Drawing No. 0/2/65/386 Alt-6. [ warranty Period: 30 Months After The Date Of Delivery ] [quantity Tolerance (+/-): 5 %age , 2026-01-19
India The Project Involves The Installation And Maintenance Of Out-of-home Advertising Boards At Various Railway Stations. This Includes Erecting Display Structures At Specified Locations, Ensuring Compliance With Local Regulations, And Managing The Upkeep Of T 2026-01-19
India Laying Of Road From Elec Pole No. 75/5 To King Arcade Appartment Beside At Boggula Dibba In Ward No.40 In Vizianagarm Municipal Corporation. Est Cost Rs.24.23 Lakhs. 2026-01-19
-Supply,-Installation,-Commissioning-And-Training-Of-Ultrasonic-Spray-Coating-System>India -Supply,-Installation,-Commissioning-And-Training-Of-Ultrasonic-Spray-Coating-System>Cecri26092025mmp-06520247 - Ultrasonic Spray Coating System
Supply, Installation, Commissioning And Training Of Ultrasonic Spray Coating System
-Supply,-Installation,-Commissioning-And-Training-Of-Ultrasonic-Spray-Coating-System>2026-01-19
Philippines Sports Development Program - Sports Uniform - San Luis, Aurora 2026-01-19
-Cc-Road-Construction-Work-Sher-Ji-Kyal-Ki-Gali-W.n.54,>India -Cc-Road-Construction-Work-Sher-Ji-Kyal-Ki-Gali-W.n.54,>W1 Cc Road W.n. 54
Cc Road Construction Work Sher Ji Kyal Ki Gali W.n.54,
-Cc-Road-Construction-Work-Sher-Ji-Kyal-Ki-Gali-W.n.54,>2026-01-19
India Improvement Of Road By Cement Concrete From The House Of Bidhan Biswas Towards The House Of Bhajan Biswas, Activity Id-109396599 2026-01-19
-Construction-Of-Cc-Road-Gp-Haroa-Block-Haroa-Ced-iii-Sdb-395m-Core-Plan>India -Construction-Of-Cc-Road-Gp-Haroa-Block-Haroa-Ced-iii-Sdb-395m-Core-Plan>Wbsdb/ee/ced-iii/ Nit-24(e)/2025-26/11
Construction Of Cc Road Gp Haroa Block Haroa Ced-iii Sdb 395m Core Plan
-Construction-Of-Cc-Road-Gp-Haroa-Block-Haroa-Ced-iii-Sdb-395m-Core-Plan>2026-01-19
Whats app