Filter Search


Asia


Location Summary Deadline
India The Project Involves The Survey, Supply, Installation, Testing, And Commissioning Of Electrical Connections And Infrastructure, Including 11/33 Kv And Lt Lines, For Various Clients In Raipur. This Includes Connections For Medical Facilities, Residential C 2026-01-29
India Bioremediation Of Legacy Waste At Old Dumpsites In Various Ulbs Under Swachh Bharat Mission Urban 2.0 Cluster 4 2026-01-29
India Construction Of Pcc Road From Sanatan Mudi House To Upar Harimandir At Nutandih Apas/01/238/86/0003 2026-01-29
India Horn-12 Deg & 42 Deg Assembly 2030 For High Reach Pantograph .#* Horn-12 Deg & 42 Deg Assembly 2030 For High Reach Pantograph Tpye Wbl85h r As Per M/s Schunk Part No 909010007000 Make - Schunk Carbon Technology India Privat e. [ Warranty Period: 30 Months 2026-01-29
India Construction Of Various Type Of Works At Various Places At Block – Dhamtari, District- Dhamtari (c.g.) I/c Internal Water Supply, Sanitary Fitting, Electrification Work Etc. 2026-01-29
Bangladesh Installation Of Ro Reverse Osmosis Plant Capacity 250l/h For Satkhira Medical College Under Satkhira District. 2026-01-29
Kuwait Event_66904 - 1059575 - Maa D/c Induction Motor 2026-01-29
Bangladesh Procurement Of Computer Accessories Repair 2026-01-29
India Toggle, Rotary Lock Lift & Pin Assembly .#* Toggle, Rotary Lock Lift & Pin Assembly To Sanrok Drg No.1ed-1013 Pt. 5,6 & 9 . (1 Toggle +1 Rotary Lock Lift+1 Pin Assy.)= 1 Set, Make- Sanrok To Rdso Specification No. Rd so/2011/cg-03 (rev-3). [ Warranty Peri 2026-01-29
Japan Gas To Use In Tokyo Detention House ; Medium-pressure Gas 1, 318, 900? And Low-pressure Gas 115, 800? 2026-01-29
Whats app