Filter Search


Asia


Location Summary Deadline
India Replacement Of 2nos 220kv Circuit Breakers To 220kv Vss-kalapaka 1 And 2 Feeders Under Psdf-phase 2 At 220kv Vss 2024-12-02
India Construction Of Model School For Ebb At Bhss Nadihal Bandipora 2024-12-02
-Laying-Of-Di-Pipe-Along-With-Interconnection-Arrangement-At-Ohr-Site-Construction-Of-Boundary-Wall-Pathway-Sinking-Of-Tubewell-At-Jhalda-ii-(zone-ix)-Under-Purulia-W/s-Scheme-(northern-Sector)-Of-Purulia-Division,-Phe-Dte.>India -Laying-Of-Di-Pipe-Along-With-Interconnection-Arrangement-At-Ohr-Site-Construction-Of-Boundary-Wall-Pathway-Sinking-Of-Tubewell-At-Jhalda-ii-(zone-ix)-Under-Purulia-W/s-Scheme-(northern-Sector)-Of-Purulia-Division,-Phe-Dte.>Wbphed/10/pd/2024-25/sl.26
Laying Of Di Pipe Along With Interconnection Arrangement At Ohr Site Construction Of Boundary Wall Pathway Sinking Of Tubewell At Jhalda-ii (zone-ix) Under Purulia W/s Scheme (northern Sector) Of Purulia Division, Phe Dte.
-Laying-Of-Di-Pipe-Along-With-Interconnection-Arrangement-At-Ohr-Site-Construction-Of-Boundary-Wall-Pathway-Sinking-Of-Tubewell-At-Jhalda-ii-(zone-ix)-Under-Purulia-W/s-Scheme-(northern-Sector)-Of-Purulia-Division,-Phe-Dte.>2024-12-02
Bangladesh Supply Of Battery & Tyre For Toyota, Prado, Pajero & Jeep. 2024-12-02
India Manufacture And Supply Of Cms Crossing 60 Kg. 1 In 8.5 To Rdso Drg. No. T-4967 With Fittings And Specification Irs T-29 (revised-2023) With Latest Alteration In Drawing And Specifications Issued By Rdso Up To One Month Prior To Tender Closing Date For Cms 2024-12-02
Bangladesh Improvement Work Of Road Including Drains Of Abdul Hamid Lane Under Ward No. 69 2024-12-02
Bangladesh Procurement Of Dietary Articles Of Package-10 For The Period Of January/2025 To June/2025 2024-12-02
Philippines 25ji0010 – Construction Of Flood Control Structure Revetment Wall Along Sibuguey River Upstream, Barangay Concepcion, Alicia, Zamboanga Sibugay 2024-12-02
India Providing Of Manpower Outsourcing Services - Minimum Wage - Unskilled; Secondary School; Admin 2024-12-02
-Cloth-Cotton-Calico-Unbleached-91-Cms-Wide-As-Per-Is:1544-2022-,-But-With-Scouring-Loss-4-Percent-And-Shrinkage-3.5-Percent-Instead-Of-Value-Given-In-Table-2-Of-The-Subject-Is.-[-Wa>India -Cloth-Cotton-Calico-Unbleached-91-Cms-Wide-As-Per-Is:1544-2022-,-But-With-Scouring-Loss-4-Percent-And-Shrinkage-3.5-Percent-Instead-Of-Value-Given-In-Table-2-Of-The-Subject-Is.-[-Wa>Supply Of Procurement Of Cloth Cotton Calico Unbleached 91 Cms Etc.
Cloth Cotton Calico Unbleached 91 Cms Wide As Per Is:1544-2022 , But With Scouring Loss 4 Percent And Shrinkage 3.5 Percent Instead Of Value Given In Table 2 Of The Subject Is. [ Wa
-Cloth-Cotton-Calico-Unbleached-91-Cms-Wide-As-Per-Is:1544-2022-,-But-With-Scouring-Loss-4-Percent-And-Shrinkage-3.5-Percent-Instead-Of-Value-Given-In-Table-2-Of-The-Subject-Is.-[-Wa>2024-12-02
Whats app