Filter Search


Asia


Location Summary Deadline
India Construction Of 4 Nos New Balancing Culvert Of Opening Size 1x5.0x4.0 Mtr Each Km 262/11-13 Between Hjp - Ckrd, Km 234/19-25 Between Spp-sdg, Km 225/1-2 Between Spp-nnl & Km 220/9-11 Between Mog-nnl In Hjp-bca Section Of Sonpur Division. 2024-11-27
-Supply-Of-Esp-Isolator-Switch-Insulator-For-Wtps-Stage-1,-Gsecl.-
-Supply-Of-Wear-Sleeve-For-Modified-Roller-Journal-Shaft-Of-Roller-Journal-Assembly-Coal-Mill>India
-Supply-Of-Esp-Isolator-Switch-Insulator-For-Wtps-Stage-1,-Gsecl.-
-Supply-Of-Wear-Sleeve-For-Modified-Roller-Journal-Shaft-Of-Roller-Journal-Assembly-Coal-Mill>Supply Of Siemens Make Actuator For Ac Plant Ahu Of Unit No. 1 To 3 , Wanakbori Tps.
Supply Of Esp Isolator Switch Insulator For Wtps Stage-1, Gsecl.
Supply Of Wear Sleeve For Modified Roller Journal Shaft Of Roller Journal Assembly Coal Mill
-Supply-Of-Esp-Isolator-Switch-Insulator-For-Wtps-Stage-1,-Gsecl.-
-Supply-Of-Wear-Sleeve-For-Modified-Roller-Journal-Shaft-Of-Roller-Journal-Assembly-Coal-Mill>2024-11-27
qty:1
>India
qty:1
>Supply Of Blood Pressure Measuring Device (mercury)
qty:1
qty:1
>2024-11-27
qty:325
>India
qty:325
>Supply Of Desktop Computers (q2)
qty:325
qty:325
>2024-11-27
-Parcel-Space-In-Fslr-2-Coach-(single-Compartment)-
-Parcel-Space-In-Rslr-1-Coach-(single-Compartment)-
-Parcel-Space-In-Fslr-Coach-(single-Compartment)-
-Parcel-Space-In-Fslr-1-Coach-(sin>India
-Parcel-Space-In-Fslr-2-Coach-(single-Compartment)-
-Parcel-Space-In-Rslr-1-Coach-(single-Compartment)-
-Parcel-Space-In-Fslr-Coach-(single-Compartment)-
-Parcel-Space-In-Fslr-1-Coach-(sin>Parcel Space In Fslr-1 Coach (single Compartment)
Parcel Space In Fslr-2 Coach (single Compartment)
Parcel Space In Rslr-1 Coach (single Compartment)
Parcel Space In Fslr Coach (single Compartment)
Parcel Space In Fslr-1 Coach (sin
-Parcel-Space-In-Fslr-2-Coach-(single-Compartment)-
-Parcel-Space-In-Rslr-1-Coach-(single-Compartment)-
-Parcel-Space-In-Fslr-Coach-(single-Compartment)-
-Parcel-Space-In-Fslr-1-Coach-(sin>2024-11-27
India Providing, Installation, Testing And Commissioning Of 25 Kwp Off Grid Solar Power Plant At 13 Nos Bops Of 92 Bn And 166 Bn Of Shq Jsmr (n) Under Ftr Hq Rajasthan 2024-11-27
qty:6
>India
qty:6
>Supply Of Suction Pipe Assy Firewall To Filter, Turbo Charger Assy, Clutch Release Brg, Reverse Light Switch, Repair Kit Mechanical Transmission
qty:6
qty:6
>2024-11-27
qty:6
>India
qty:6
>Supply Of Mtr, Sc, 415v, 225m, 1500rpm, 45kw, Ie3
qty:6
qty:6
>2024-11-27
Bangladesh Spare Parts For Itcc (integrated Turbine & Compressor Control) System 2024-11-27
Philippines Construction Of Kalinga Synoptic Station Building, Observers Quarters, Powerhouse, Perimeter Fence, Gate & Signage 2024-11-27
Whats app