Filter Search


Asia


Location Summary Deadline
qty:13661
>India
qty:13661
>Supply Of Household Laundry Detergent Powders As Per Is 4955 (q4)
qty:13661
qty:13661
>2025-02-10
qty:567
>India
qty:567
>Supply Of Coarse Aggregate (v2) Conforming To Is 383 (q3)
qty:567
qty:567
>2025-02-10
Nepal Financial Proposal Opening For Construction 2025-02-10
qty:5
>India
qty:5
>Supply Of True Rms Clamp Meter (q3)
qty:5
qty:5
>2025-02-10
India Supply Of Leasing Of Electric Vehicles (long Term) - Wet Lease; E Vehicle; 3000 Kms X 360 Hrs Per Month; 60 Months Lease; White 2025-02-10
qty:1
>India
qty:1
>Supply Of Truck Mounted Fog Cannon System (coal India) (q3)
qty:1
qty:1
>2025-02-10
-Supply,-Erection,-Testing-&-Commissioning-Of-2x5kva-Ups,-Dual-Redundant,-Hot-Standby,-Charging-Capacity-For-200-Ah-Battery-Set-As-Per-Rdso-Spec.-No.-Ti/spc/rcc/scada/0133-(rev-2)-Or-Latest-[-Warrant>India -Supply,-Erection,-Testing-&-Commissioning-Of-2x5kva-Ups,-Dual-Redundant,-Hot-Standby,-Charging-Capacity-For-200-Ah-Battery-Set-As-Per-Rdso-Spec.-No.-Ti/spc/rcc/scada/0133-(rev-2)-Or-Latest-[-Warrant>Supply Of Supply, Erection, Testing & Commissionin
Supply, Erection, Testing & Commissioning Of 2x5kva Ups, Dual Redundant, Hot Standby, Charging Capacity For 200 Ah Battery Set As Per Rdso Spec. No. Ti/spc/rcc/scada/0133 (rev-2) Or Latest [ Warrant
-Supply,-Erection,-Testing-&-Commissioning-Of-2x5kva-Ups,-Dual-Redundant,-Hot-Standby,-Charging-Capacity-For-200-Ah-Battery-Set-As-Per-Rdso-Spec.-No.-Ti/spc/rcc/scada/0133-(rev-2)-Or-Latest-[-Warrant>2025-02-10
India Supply Of Ball Point Pens (v2) As Per Is 3705 (q4), Gel Pen (v3) (q4), Black Lead Pencils (v2) As Per Is 1375 (q4), Eraser (q4), Stapler Pin / Staples (v2) (q4), Paper Adhesive, Liquid Gum Office Paste Type As Per Is 2257 (rev) (q3), Highlighter Pen (q4), 2025-02-10
-Primary-Cell-(dry-Leclanche-Type-)-1.5-Volt-45-Ah-As-Per-Irs-Specification-No.-irs-s-95/96-Amd-1-Or-Latest-[-Warranty-Period:-30-Months-After-The-Date-Of-Delivery-]-]>India -Primary-Cell-(dry-Leclanche-Type-)-1.5-Volt-45-Ah-As-Per-Irs-Specification-No.-irs-s-95/96-Amd-1-Or-Latest-[-Warranty-Period:-30-Months-After-The-Date-Of-Delivery-]-]>Supply Of Primary Cell (dry Leclanche Type ) 1.5 Volt 45
Primary Cell (dry Leclanche Type ) 1.5 Volt 45 Ah As Per Irs Specification No.-irs-s-95/96 Amd-1 Or Latest [ Warranty Period: 30 Months After The Date Of Delivery ] ]
-Primary-Cell-(dry-Leclanche-Type-)-1.5-Volt-45-Ah-As-Per-Irs-Specification-No.-irs-s-95/96-Amd-1-Or-Latest-[-Warranty-Period:-30-Months-After-The-Date-Of-Delivery-]-]>2025-02-10
qty:5
>India
qty:5
>Supply Of Backhoe Loaders (v2) (q2)
qty:5
qty:5
>2025-02-10
Whats app