Filter Search


Asia


Location Summary Deadline
India Rc For Supply Of Iso Propyl Alcohol. 2025-01-24
India Supply Of Insulated Hot Lunch Box With Stainless Steel Container At Kolkata And Silvassa Plant 2025-01-24
-Ballah-Pilling-Work-From-Hafej-Saheb-House-To-Siraj-Halder-House.>India -Ballah-Pilling-Work-From-Hafej-Saheb-House-To-Siraj-Halder-House.>Sl.no. 3. Ballah Pilling Work From Hafej Saheb House To Siraj Halder House.
Ballah Pilling Work From Hafej Saheb House To Siraj Halder House.
-Ballah-Pilling-Work-From-Hafej-Saheb-House-To-Siraj-Halder-House.>2025-01-24
Azerbaijan Tender Are Invited For Purchase Of Technical Service For Air Conditioning System Equipment estimated Price: 69, 784.30 Azn 2025-01-24
India Operation Of Laboratory Activities For Howrah District Laboratory At Domjur Under Howrah Division, Phe Dte. For 12 (twelve) Months W.e.f. 01.02.2025 To 31.01.2026 2025-01-24
India Work Of Fencing Surround Transformer Center For Various Sdn Under Rrd. 2025-01-24
India Supply Of Potable Drinking Water Through Road Tankers In The Jurisdiction Of Aden (hq) Ajmer For 24 Months. 2025-01-24
-Laying-of-33-KV-UG-Cable-by-Micro-tunneling-at-Railway-crossing-for-drawl-of-33-KV-New-Double-circuit-line-from-Mankar-132/33/11-KV-substation-to-Proposed-Paraj-33/11-KV-substation-Under-Burdwan-North-Division-in-Purba-Bardhaman-Region,-W>India -Laying-of-33-KV-UG-Cable-by-Micro-tunneling-at-Railway-crossing-for-drawl-of-33-KV-New-Double-circuit-line-from-Mankar-132/33/11-KV-substation-to-Proposed-Paraj-33/11-KV-substation-Under-Burdwan-North-Division-in-Purba-Bardhaman-Region,-W>Rail crossing of 33 KV UG line at Paraj Railway Station
Laying of 33 KV UG Cable by Micro tunneling at Railway crossing for drawl of 33 KV New Double-circuit line from Mankar 132/33/11 KV substation to Proposed Paraj 33/11 KV substation Under Burdwan North Division in Purba Bardhaman Region, W
-Laying-of-33-KV-UG-Cable-by-Micro-tunneling-at-Railway-crossing-for-drawl-of-33-KV-New-Double-circuit-line-from-Mankar-132/33/11-KV-substation-to-Proposed-Paraj-33/11-KV-substation-Under-Burdwan-North-Division-in-Purba-Bardhaman-Region,-W>2025-01-24
-Member-Complete-As-Per-Drawing-No.-3.10113.0.03.095.010.-[-Warranty-Period:-30-Months-After-The-Date-Of-Delivery-]-]member-As-Per-Drawing-No.-3.10113.0.03.095.105.-[-Warranty-Period:-30-Months-After-Thedate-Of-Delivery-]-]>India -Member-Complete-As-Per-Drawing-No.-3.10113.0.03.095.010.-[-Warranty-Period:-30-Months-After-The-Date-Of-Delivery-]-]member-As-Per-Drawing-No.-3.10113.0.03.095.105.-[-Warranty-Period:-30-Months-After-Thedate-Of-Delivery-]-]>Supply Of Member Complete
Member Complete As Per Drawing No. 3.10113.0.03.095.010. [ Warranty Period: 30 Months After The Date Of Delivery ] ]member As Per Drawing No. 3.10113.0.03.095.105. [ Warranty Period: 30 Months After Thedate Of Delivery ] ]
-Member-Complete-As-Per-Drawing-No.-3.10113.0.03.095.010.-[-Warranty-Period:-30-Months-After-The-Date-Of-Delivery-]-]member-As-Per-Drawing-No.-3.10113.0.03.095.105.-[-Warranty-Period:-30-Months-After-Thedate-Of-Delivery-]-]>2025-01-24
>India >Fabrication & Erection Of Decking Plate, Conveyor Stringers, And Hopper Discharge Chutes, Transfer Pipes & Its Related Structures Of Various Conveyor Belts In Suphala Bagging, Urea Bagging, Anp Bagging & Material Handling Plant In Rcf Trombay Unit.
>2025-01-24
Whats app