Filter Search


Asia


Location Summary Deadline
Bangladesh Systematic Development Work Of 11/0.4kv And 0.4kv Line To Reduce Low Voltage By Installing 11/0.4kv Sub-station, Under Of 11 Kv Rudrogram Feeder From Choupagaria To Nazrul Memberbari And Choupagaria Bangla Bazae To Shoher Daner Mill As Well As It S Surrou 2025-02-10
-Preparation-And-Processing-Of-Fca-Proposal-Of>India -Preparation-And-Processing-Of-Fca-Proposal-Of>Preparation And Processing Of Fca Proposal Of Sarahan Chandigarh Road In Respect Of Hp.pwd (br) Division, Sarahan (sh- Construction Of Single Lane To Double Lane Sarahan Chandigarh Road Km 0/0 To 42/0).
Preparation And Processing Of Fca Proposal Of
-Preparation-And-Processing-Of-Fca-Proposal-Of>2025-02-10
-Amb-Gp-2024-25-Earthfilling-At-Pankeerikulam-Road-Ward-20,-Pro-No.-259/25>India -Amb-Gp-2024-25-Earthfilling-At-Pankeerikulam-Road-Ward-20,-Pro-No.-259/25>Amb Gp 2024-25 Earthfilling At Pankeerikulam Road Wardd 20, Pro No. 259/25
Amb Gp 2024-25 Earthfilling At Pankeerikulam Road Ward 20, Pro No. 259/25
-Amb-Gp-2024-25-Earthfilling-At-Pankeerikulam-Road-Ward-20,-Pro-No.-259/25>2025-02-10
-Alkyl-Dimethyl-Benzyl-Ammonium-Chloride-Sot-125-1-Lit-]>India -Alkyl-Dimethyl-Benzyl-Ammonium-Chloride-Sot-125-1-Lit-]>Supply Of Alkyl Dimethyl Benzyl Ammonium Chloride Sot-125 1 Lit
Alkyl Dimethyl Benzyl Ammonium Chloride Sot-125 1 Lit ]
-Alkyl-Dimethyl-Benzyl-Ammonium-Chloride-Sot-125-1-Lit-]>2025-02-10
India Installation Of 04 Nos. Pump-motor Sets At Cisf Pond, Sirki Pond, Dam (near Godavari Camp) And Lower Kusmunda-2 (east) Sumps Including Laying And Jointing Of Pipelines And Making 02 Nos. Tanker Filling Points Near Check Dam And Sirki Pond At Dep. 2025-02-10
qty:77000
>India
qty:77000
>Supply Of Carbon Dioxide Gas, Purity: 99 8% V/v
qty:77000
qty:77000
>2025-02-10
-Construction-Of-Open-Surface-Drain-At-Shanti-Pally-Ii,-Starting-From-Library-Road-To-Ho-Babul-Bhattacharya-In-Ward-No-16-Within-Champdany-Municipality.>India -Construction-Of-Open-Surface-Drain-At-Shanti-Pally-Ii,-Starting-From-Library-Road-To-Ho-Babul-Bhattacharya-In-Ward-No-16-Within-Champdany-Municipality.>Construction Of Open Surface Drain.
Construction Of Open Surface Drain At Shanti Pally Ii, Starting From Library Road To Ho Babul Bhattacharya In Ward No 16 Within Champdany Municipality.
-Construction-Of-Open-Surface-Drain-At-Shanti-Pally-Ii,-Starting-From-Library-Road-To-Ho-Babul-Bhattacharya-In-Ward-No-16-Within-Champdany-Municipality.>2025-02-10
-1hp-Single-Phase-Starters-Control-Panel-For-Submersible-Pump.-(gem-Item)-]>India -1hp-Single-Phase-Starters-Control-Panel-For-Submersible-Pump.-(gem-Item)-]>Supply Of 1hp Single Phase Starters Control
1hp Single Phase Starters Control Panel For Submersible Pump. (gem Item) ]
-1hp-Single-Phase-Starters-Control-Panel-For-Submersible-Pump.-(gem-Item)-]>2025-02-10
qty:2
>India
qty:2
>Supply Of Breast Examination Model (q3)
qty:2
qty:2
>2025-02-10
-Insulating-Plate-Lower-To-Rdso-Drg-No.-Skel-4634-Alt-1,-Similar-To-M/s.-Repl-Part.-No.-S2131-Or-To-M/s.-Aal-Part.-No.-G2131-[-Warranty-Period:-30-Months-After-The-Date-Of-Delivery-][quantity-Tolerance-(+/-):-5-%age-,>India -Insulating-Plate-Lower-To-Rdso-Drg-No.-Skel-4634-Alt-1,-Similar-To-M/s.-Repl-Part.-No.-S2131-Or-To-M/s.-Aal-Part.-No.-G2131-[-Warranty-Period:-30-Months-After-The-Date-Of-Delivery-][quantity-Tolerance-(+/-):-5-%age-,>Supply Of Insulating Plate Lower
Insulating Plate Lower To Rdso Drg No. Skel 4634 Alt-1, Similar To M/s. Repl Part. No. S2131 Or To M/s. Aal Part. No. G2131 [ Warranty Period: 30 Months After The Date Of Delivery ][quantity Tolerance (+/-): 5 %age ,
-Insulating-Plate-Lower-To-Rdso-Drg-No.-Skel-4634-Alt-1,-Similar-To-M/s.-Repl-Part.-No.-S2131-Or-To-M/s.-Aal-Part.-No.-G2131-[-Warranty-Period:-30-Months-After-The-Date-Of-Delivery-][quantity-Tolerance-(+/-):-5-%age-,>2025-02-10
Whats app