Filter Search


Asia


Location Summary Deadline
-Repair-Of-25kva,-63kva,-100kva-And-200kva-(aluminum-Wound>India -Repair-Of-25kva,-63kva,-100kva-And-200kva-(aluminum-Wound>Repair Of 25kva, 63kva, 100kva And 200kva (aluminum Wound Crgo Core), 500 Kva (copper Wound Crgo Core) Distribution Transformers At Trw Ranchi , Khunti, And Itki Under Electric Supply Circle.
Repair Of 25kva, 63kva, 100kva And 200kva (aluminum Wound
-Repair-Of-25kva,-63kva,-100kva-And-200kva-(aluminum-Wound>2026-01-12
India Tender Invited For Tricycle Or Rickshaw For Carrying Goods (v2) (q3)##quantity: 2## 2026-01-12
India Construction Of Concrete Roads In Ward-23 Indiranagar, From Shashis House To Brajeshs House, From The Main Road To Rakesh Kamras House, From Mastermind Library To Sunita Tamtas House, And In Various Lanes. 2026-01-12
-Construction-Of-Cover-Drain-At-Kaikhali-Part-No-07-From-Shyama-Das-Upto-91-Bus-Road-In-Ward-No--06-Under-Bmc.-(scheme-Id--Apas/01/117/007/0001)-(2nd-Call)>India -Construction-Of-Cover-Drain-At-Kaikhali-Part-No-07-From-Shyama-Das-Upto-91-Bus-Road-In-Ward-No--06-Under-Bmc.-(scheme-Id--Apas/01/117/007/0001)-(2nd-Call)>Nit No. 1434/pwd(bmc), Dtd. 05.12.2025
Construction Of Cover Drain At Kaikhali Part No-07 From Shyama Das Upto 91 Bus Road In Ward No -06 Under Bmc. (scheme Id- Apas/01/117/007/0001) (2nd Call)
-Construction-Of-Cover-Drain-At-Kaikhali-Part-No-07-From-Shyama-Das-Upto-91-Bus-Road-In-Ward-No--06-Under-Bmc.-(scheme-Id--Apas/01/117/007/0001)-(2nd-Call)>2026-01-12
Nepal Malika Mavi Field Construction Works 2026-01-12
Nepal Construction Work Of Laxmi Narayan Community Building In Buddhashanti Rm Ward No 1 2026-01-12
India Repairing And Maintenance Work At Asarwa Mamlatdar Office And Chora Office, Ahmedabad. 2026-01-12
Bangladesh Cleaning Of Drain And Cutting Of Jungles At Division And Circle Office, Inspection Banglow At Saheb Quarter And Dholadia Bwdb Colony Under Mymensingh Wd Division, Bwdb, Mymensingh During The Fy 2025-2026. 2026-01-12
Bangladesh Printing Materials 2026-01-12
India Technical Specification Of Switch Board Cabinet For Hog Compliant Lslrd Coaches. Specification Includes Various Electrical Components And Devices Required For The Coaches. 3 Phase Over Current Earth Fault Relay, Insulation Monitoring Device, Voltmeter Wit 2026-01-12
Whats app