Filter Search


Asia


Location Summary Deadline
Turkey Building Repair Work Will Be Done 2025-07-21
India Tab. Levetiracetam 750 .#* 14106 - Tab. Levetiracetam 750 ] 2025-07-21
India Providing Internal Electrification For Making Provisions Of Generator Connection To Different Rooms Including Yard Lighting From Hospital Outdoor And Indoor Passage Kitchen And Morgue At Takarjala Chc Jampuijala Sepahijala Tripura 2025-07-21
India Pressure Gauge (bc) For Lhb Coaches. .#* Pressure Gauge (bc) For Lhb Coaches To Kbi Part No.166329(bc) Or Ftril Part no. 0220070 00. To Be Procured From Kbi, Ftril Or Rdso Approved Sources. [ Warranty period: 36 Months After The Date Of Delivery ] [quanti 2025-07-21
India P/laying 60 Mm Thick Perforated Tiles On Side Berms Of Outside Shahi Mohalla Park To Dusshera Ground 2025-07-21
-IMPROVEMENTS-TO-ROAD-FROM-CHANDUR-VILLAGE-PATHAR,DONE-VASAHAT-TO-JOIN-CHANDURTEK-SAINIK-TAKALI-ROAD-IN-CHANDUR-VILLAGE-OF-CHIKKODI-TALUKA.>India -IMPROVEMENTS-TO-ROAD-FROM-CHANDUR-VILLAGE-PATHAR,DONE-VASAHAT-TO-JOIN-CHANDURTEK-SAINIK-TAKALI-ROAD-IN-CHANDUR-VILLAGE-OF-CHIKKODI-TALUKA.>ASPHALT ROAD
IMPROVEMENTS TO ROAD FROM CHANDUR VILLAGE PATHAR,DONE VASAHAT TO JOIN CHANDURTEK SAINIK TAKALI ROAD IN CHANDUR VILLAGE OF CHIKKODI TALUKA.
-IMPROVEMENTS-TO-ROAD-FROM-CHANDUR-VILLAGE-PATHAR,DONE-VASAHAT-TO-JOIN-CHANDURTEK-SAINIK-TAKALI-ROAD-IN-CHANDUR-VILLAGE-OF-CHIKKODI-TALUKA.>2025-07-21
India Modified Side Stopper Assembly For Wag-7 [modified Side Stopper assembly For Wag-7 Loco As Per Rdso Drg. No. Skvl -134 (alt-6).] .#* Modified Side Stopper Assembly For Wag-7 Loco As Per Rdso Drg. No. Skvl -134 (a lt-6). [ Warranty Period: 30 Months After 2025-07-21
India Extension Of Ht/lt Line For Providing 3 (three) Phase Service Connection To The Establishment Of Modern Abattoir For Pig Cum Pork Processing Plant Construction At Karaicherra, Machmara Under Esd-pecharthal 2025-07-21
India Un-bleached Calico Mop .#* Un-bleached Calico Mop (polishing), Size : 8" X 100 Folds. [ Warranty Period: 30 Months Aft er The Date Of Delivery ] ] 2025-07-21
India Construction Balance Compound Wall And Providing Of Rest Area At Southrajupalem Harijanawada Burial Ground In Division No 12 Of Nmc. 2025-07-21
Whats app