Filter Search


Asia


Location Summary Deadline
-Repairing-And-Improvement-Of-Sluice-Gates-And-Other-Allied-Works-At-Maniktala-Lock-Gate,-Block---Uluberia-I,-P.s--Uluberia,-Dist.-Howrah.>India -Repairing-And-Improvement-Of-Sluice-Gates-And-Other-Allied-Works-At-Maniktala-Lock-Gate,-Block---Uluberia-I,-P.s--Uluberia,-Dist.-Howrah.>Wbiw/ee/med/e-nit-22/2025-26 (sl 07)
Repairing And Improvement Of Sluice Gates And Other Allied Works At Maniktala Lock Gate, Block - Uluberia I, P.s- Uluberia, Dist. Howrah.
-Repairing-And-Improvement-Of-Sluice-Gates-And-Other-Allied-Works-At-Maniktala-Lock-Gate,-Block---Uluberia-I,-P.s--Uluberia,-Dist.-Howrah.>2025-12-12
India Tender Invited For Premier Suit Desk With Pedestal Plus Return Desk Unit Eru Size , Return Desk Eru 1200w By 450d By 610h , Cross High Back Chair , Cross Full Back Chair , Sofa 3 Seater 1820w By 840d By 480760h , Vertical Storage Door Unit Vsdu 2 Size 735 2025-12-12
India Resurfacing Of Bhutadi Chhelanka Road Km.0/000 To 3/000 Ta. Visavadar Dist. Junagadh 2025-12-12
India Tender Invited For Comprehensive Amc Of Ductable Package Ac Units At Bdl-kbu For 2 Years .#* Operation And Maintenance Of Hvac System (heating, Ventilation And Air Conditioning System)##quantity: 1## 2025-12-12
India Guntakal Division: Sw-i- Srikalahasti:-provision Of 4 No. Of Escalators(up & Down) for 12m Fob. Sw-ii -kadapa: -provision Of 3 No. Of Escalators (up & Down) For New 12m Fob. Sw-iii -(i)anantapur: -provision Of 6 No. Of Escalators (up & Down) For new 12m F 2025-12-12
India Valve Spindle For Btpn Wagon To Rdso Drg. No. Wd-86081-s-61, Alt-14, Item- 10". .#* Valve Spindle For Btpn Wagon To Rdso Drg. No. Wd-86081-s-61, Alt-14, Item-10". [ War ranty Period: 30 Months After The Date Of Delivery ] [quantity Tolerance (+/-): 5 %age 2025-12-12
India Supply, Installation, Testing And Commissioning Of Digital Soldering/de-soldering/hot Air Station. complete Rework Station System 230v Make-jbc, Weller, Goot Or Similar, Specification As Per attached Annexure-1. .#* Supply, Installation, Testing And Commi 2025-12-12
India Hiring Of Rental Contract For Gps Tracking Devices Over Jat Division For Mointoring , keyamn & Patrolmen For Three Years. 2025-12-12
-Restoration-Of-Flooded-Road-Cuts-Due-To-Flood-Of-Various-Link-Roads-In-Naraingarh-Constituency-Group-No.2-Road-Ids---4487,-4494,-4546,-8168,-8719.>India -Restoration-Of-Flooded-Road-Cuts-Due-To-Flood-Of-Various-Link-Roads-In-Naraingarh-Constituency-Group-No.2-Road-Ids---4487,-4494,-4546,-8168,-8719.>Restoration Of Flooded Road...
Restoration Of Flooded Road Cuts Due To Flood Of Various Link Roads In Naraingarh Constituency Group No.2 Road Ids - 4487, 4494, 4546, 8168, 8719.
-Restoration-Of-Flooded-Road-Cuts-Due-To-Flood-Of-Various-Link-Roads-In-Naraingarh-Constituency-Group-No.2-Road-Ids---4487,-4494,-4546,-8168,-8719.>2025-12-12
India Renovation To Mandali Building Near Christian Street At Chheligada Of Chheligada Irrigation Project 2025-12-12
Whats app