Filter Search


Asia


Location Summary Deadline
-Operation_and_guarding_of_pumping_machinery__automatic_operation_including_all_allied_electro_mechanical_components_installed_at_belshar__block__raina_1___w_s_scheme_in_the_district_of_purba_bardhaman_division__under_cmd__ph>India -Operation_and_guarding_of_pumping_machinery__automatic_operation_including_all_allied_electro_mechanical_components_installed_at_belshar__block__raina_1___w_s_scheme_in_the_district_of_purba_bardhaman_division__under_cmd__ph>Wbphed/ee/cmd/enit11/s24
Operation_and_guarding_of_pumping_machinery__automatic_operation_including_all_allied_electro_mechanical_components_installed_at_belshar__block__raina_1___w_s_scheme_in_the_district_of_purba_bardhaman_division__under_cmd__ph
-Operation_and_guarding_of_pumping_machinery__automatic_operation_including_all_allied_electro_mechanical_components_installed_at_belshar__block__raina_1___w_s_scheme_in_the_district_of_purba_bardhaman_division__under_cmd__ph>2026-01-09
-Sheet-Pilling-To-Support-The-Pipeline-Alignment-And-Restoration-Of-Pipeline-Alongside-The-Posnd-Located-At-Panchpota-Village-Under-Gobindapur-Zone-i-Ground-Water-Based-Pwss-Under-Santipur-Block-Under-Nadia-Arsenic-Division-i,>India -Sheet-Pilling-To-Support-The-Pipeline-Alignment-And-Restoration-Of-Pipeline-Alongside-The-Posnd-Located-At-Panchpota-Village-Under-Gobindapur-Zone-i-Ground-Water-Based-Pwss-Under-Santipur-Block-Under-Nadia-Arsenic-Division-i,>Wbphe_13_nad_i_25_26_3
Sheet Pilling To Support The Pipeline Alignment And Restoration Of Pipeline Alongside The Posnd Located At Panchpota Village Under Gobindapur Zone-i Ground Water Based Pwss Under Santipur Block Under Nadia Arsenic Division-i,
-Sheet-Pilling-To-Support-The-Pipeline-Alignment-And-Restoration-Of-Pipeline-Alongside-The-Posnd-Located-At-Panchpota-Village-Under-Gobindapur-Zone-i-Ground-Water-Based-Pwss-Under-Santipur-Block-Under-Nadia-Arsenic-Division-i,>2026-01-09
-Construction-Of-Cement-Concrete-Road-Work-(rmc-M30)-From-1no-To-49,-P.-K.-Roy-Chowdhury-Lane-Opposite-Gkw-Main-Gate,-Under-H.m.c.-Ward-No.---39-Length-371.0m,-Width-3.30m-(avg)>India -Construction-Of-Cement-Concrete-Road-Work-(rmc-M30)-From-1no-To-49,-P.-K.-Roy-Chowdhury-Lane-Opposite-Gkw-Main-Gate,-Under-H.m.c.-Ward-No.---39-Length-371.0m,-Width-3.30m-(avg)>Wb-hmc/nit/09/ee-ii/beup/25-26
Construction Of Cement Concrete Road Work (rmc M30) From 1no To 49, P. K. Roy Chowdhury Lane Opposite Gkw Main Gate, Under H.m.c. Ward No. - 39 Length-371.0m, Width-3.30m (avg)
-Construction-Of-Cement-Concrete-Road-Work-(rmc-M30)-From-1no-To-49,-P.-K.-Roy-Chowdhury-Lane-Opposite-Gkw-Main-Gate,-Under-H.m.c.-Ward-No.---39-Length-371.0m,-Width-3.30m-(avg)>2026-01-09
Georgia Dusheti Municipality, Village Rehabilitation Of The Existing Ananuri-avenis Bridge. 2026-01-09
India Operation And Maintenance Of 2x20 Ton Capacity Lpg Establishment, And Daily Maintenance And Repair Of Lpg Operated Equipment W.r.t Gas Leakages Installed In Different Shops Of Bhel, R.c.puram, For A Period Of Two Years 2026-01-09
India Chirakkal Gp Pr-no-338/2025-26-panneri Rameshan Footpath 2026-01-09
Armenia Computer Equipment Repair Maintenance Services 2026-01-09
India Annual Plan-thennala Gp 2025-26-prj.no 145/25-26 -remaining Portion Concrete Of Perumpuzha Tharayil Padi Road 2026-01-09
Kazakhstan Maintenance/maintenance Services For Main/local Pipelines And Similar Networks/systems 2026-01-09
India Worm Drive Hose Clamp .#* Worm Drive Hose Clamp Specification:- Is:4762/2002 (reaffirmed-2021) Size-30 Mm electroplating Coating Of Cadmium Or Zinc On Iron And Steel [ Warranty Period: 30 Months After The date Of Delivery ] [quantity Tolerance (+/-): 5 %a 2026-01-09
Whats app