Filter Search


Asia


Location Summary Deadline
Bangladesh Removal Of Earth And Various Obstacles Of N-2 D Irrigation Khal From Km 2.000 To Km 3.000 = 1.000 Km I/c Cip Under Chandpur Water Development Division, Bwdb, Chandpur During The Year 2025-2026. 2026-01-18
Bangladesh Precautionary Bank Protection Works Along The Left Bank Of Dakatia River From Km 6.715 To Km 6.735= 20 M Adjacent To Ichuli Stack Yard At Ichuli Of Chandpur Sadar Upazila And Repair Works Of Chandpur Town Protection Area Under Chandpur Wd Division, Bwdb, 2026-01-18
Bangladesh Procurement Of 100 Mbps Dedicated Bandwidth With Public Real Ip 2026-01-18
Bangladesh Removal Of Earth In N-1 Irrigation Khal From Km 1.500 To Km 3.000 = 1.500 Km I/c Cip Under Chandpur Water Development Division, Bwdb, Chandpur During The Year 2025-2026. 2026-01-18
Bangladesh Re-excavation Of Mizi Bari Khal From Km 0.000 To Km 2.800=2800m, Located At Upazila- Kachua, District- Chandpur Under Chandpur Wd Division, Bwdb, Chandpur During The Year 2025-2026. 2026-01-18
Bangladesh Eviction Of Illegal Occupants On Cip Embankment, Khal And Other Land Of Bwdb In Co-operation With District Police And Administration Under Chandpur O&m Division, Bwdb, Chandpur During The Year 2025-26 2026-01-18
Israel Dizot - Package Deal 2026-01-18
Bangladesh Removal Of Various Obstacles Of K-17a Khal From Km 0.000 To Km 2.200 = 2.000 Km And K-18 Khal From Km. 0.000 To Km. 2.100 = 1.800; Total =3.800 Km I/c With Cip Under Chandpur Wd Division, Bwdb, Chandpur During The Year 2025-26. 2026-01-18
Bangladesh Removal Of Earth And Various Obstacles Of H-3 Irrigation Khal From Km 1.600 To Km 4.55 = 2.95 Km 1.40km Earth And 1.55km Obstracles I/c Cip Under Chandpur Water Development Division, Bwdb, Chandpur During The Year 2025-2026. 2026-01-18
Bangladesh Re-excavation Of Purbo Kalcho Bazar Khal From Km 0.000 To Km 1.400=1400m, Located At Upazila- Kachua, District- Chandpur Under Chandpur Wd Division, Bwdb, Chandpur During The Year 2025-2026. 2026-01-18
Whats app