Filter Search


Asia


Location Summary Deadline
India Tender Invited For High Capacity Thermoplastic Polyester Elastomer (hytrel) Upper Washer, To Drawing / Specification Rdso Spec. C-k409 (rev-3) Of April 2023, Rdso Drg. No. Cg-k4058, Alt-3, Mat. & Spec. As Per Drawing. [ Warranty Period: 30 Months After Th 2025-09-16
India Tender Invited For Hyd. Pump Plasser Part No. Hy842x38.22.12re Veljan Denison Part No. T6dccs-038-022-012-3r00-c1-00 Make Plasser , Parker-denison , Veljan-denison [ Warranty Period: 30 Monthsafter The Date Of Delivery ] ] 2025-09-16
India Auction Sale Of Propertys.no 12 All That Piece And Parcel Of Residential Property Being Flat No. S-207, 2nd Floor, Adan Apartment Ankleshwar City Ankleshwar Which Is Constructed Upon And Which Is Laid Out Upon Land Bearing City Survey No. 3810 Paiki, Know 2025-09-16
India Work Like Changing Vcb, Changing Control Panel Etc. Approved In The Business Plan 2025-26 In The Area Of Electricity Urban Distribution Division-town Hall, Muzaffarnagar 2025-09-16
India Capacity Enhancement Work Of Overloaded Transformers In The Area Of Electricity Urban Distribution Division-town Hall, Muzaffarnagar 2025-09-16
-Increasing-The-Capacity-Of-Overloaded-Distri>India -Increasing-The-Capacity-Of-Overloaded-Distri>Increasing The Capacity Of Overloaded Distribution Transformers And Construction Of New 11/0.4 Kv Substations In Relation To The Works Approved In The Business Plan 2025-26 In The Area Of Eudd Jansath Mzn
Increasing The Capacity Of Overloaded Distri
-Increasing-The-Capacity-Of-Overloaded-Distri>2025-09-16
India Work Related To Power Transformers Installed At 33/11 Kv Substations In Relation To The Works Approved In The Business Plan 2025-26 In The Area Of Electricity Urban Test Division, Muzaffarnagar 2025-09-16
India Tender For Branch Premises Clock Tower (mandsaur) Of Ujjain Zone. Clock Tower 2025-09-16
India The Tender Involves The Construction And Maintenance Of Various Infrastructure Projects As Specified In The Document. It Includes Detailed Specifications For Materials And Methods To Be Used, As Well As Compliance With Local Regulations And Standards. The 2025-09-16
India Construction Work Of New 11/0.4 Kv Substations In The Area Of Electricity Urban Distribution Division-town Hall, Muzaffarnagar Approved In The Business Plan 2025-26 2025-09-16
Whats app