Filter Search


Asia


Location Summary Deadline
Hong Kong Provision Of Catering Services To The Tai Tam Gap Correctional Institution Of The Correctional Services Department For A Period Of 12 Months New 2026-02-03
Nepal Daraudi River Training At Jhulungephant, Palungtar -09 & Gorkha-11, Gorkha 2026-02-03
Turkey The Storage Area Rehabilitation Construction Work Will Be Tendered. 2026-02-03
India Tender Invited For O-ring Id 11.484 X W. 139 In Buna-n70 P. No. 00071357n As Per Specn. As568-277 , O-ring Id 3.237 X W. 103 In Buna-n P. No. 00147418n As Per Specn. 2-152/n0674-70 , O-ring Id 5.487 X W. 103 In Buna-n P. No. 00130756n As Per Specn. 2-0161 2026-02-03
India Tender Invited For Potential Transformer With Ratio##quantity: 2## 2026-02-03
-Reconstruction-Of-Kadamkundu-Three-Vented-Kalyanpur-Sluice-Over-Ex-zamindary-Embankment-Along-Right-Bank-Of-River-Shilabati-At-Mouza-narajole-In-Block--Daspur-i,-P.s-daspur,-Dist-paschim-Medinipur-In-Connection-With-Gha>India -Reconstruction-Of-Kadamkundu-Three-Vented-Kalyanpur-Sluice-Over-Ex-zamindary-Embankment-Along-Right-Bank-Of-River-Shilabati-At-Mouza-narajole-In-Block--Daspur-i,-P.s-daspur,-Dist-paschim-Medinipur-In-Connection-With-Gha>Wbiw/ee/medm/e-nit-24/2025-26
Reconstruction Of Kadamkundu Three Vented Kalyanpur Sluice Over Ex-zamindary Embankment Along Right Bank Of River Shilabati At Mouza-narajole In Block- Daspur-i, P.s-daspur, Dist-paschim Medinipur In Connection With Gha
-Reconstruction-Of-Kadamkundu-Three-Vented-Kalyanpur-Sluice-Over-Ex-zamindary-Embankment-Along-Right-Bank-Of-River-Shilabati-At-Mouza-narajole-In-Block--Daspur-i,-P.s-daspur,-Dist-paschim-Medinipur-In-Connection-With-Gha>2026-02-03
India Tender Invited For Particle Shape And Size Analyzer##quantity: 1## 2026-02-03
Turkey Concrete Paving And Curb Laying Work Will Be Carried Out. 2026-02-03
India Tender Invited For Paper-based Printing Services - Printing With Material; Invitation Card For Convocation As Per Soq; Offset , Paper- Based Printing Services - Printing With Material; Envelope For Invitation Card; Offset , Paper-based Printing Services - 2026-02-03
India The Project Involves The Supply, Installation, And Commissioning Of A Non-cnc Hydraulic Press Brake With A Capacity Of 80 Tons, Intended For Use In Railway Applications. Non-cnc Hydraulic Press Brake, 80 Tons 2026-02-03
Whats app