Filter Search


Asia-Pacific


Location Summary Deadline
India Improvement With Construction Of Concrete Road And Closed Gutter To Khatav Shindevadi Road Vr-351, Tal-khatav, Dist-. 2025-08-07
India Improvement With Construction Of Concrete Road And Closed Gutter To Diskal Garavadi To Avalepathar Road Vr 11, Part-garavadi Internal Village Length, Tal-khatav, Dist-. 2025-08-07
India Improvement And Widening To Jinti Sakharwadi Badekhan Nandal Bibi Waghoshi Tathawade Upalave Daryachiwadi Bodakewadi Giravi Road Mdr-8 Km 35/500 To 39/500 Part Tathawada To Manewadi, Tal-phaltan, Dist-satara. 2025-08-07
India Supply Of Psc Sleepers Turn Out Sleeper 1 In 8.5, 60 Kg [ Warranty Period: 36 Months After The Date Ofdelivery ] 2025-08-07
India Improvements To Mdr-61nimbodi To Shetaphalgadhe Sh-54 Mhasobachiwadi Lakadi Kazad Bori Lasurne Road Mdr-167 Km 23/920 To To 27/500 Tal -indapur, Dist -pune. 2025-08-07
India Supply Of Wider Curve Psc Sleeper Rt-8979, 8980, 8981,8982. #*. Wider Curve Psc Sleeper Rt-8979 [ Warranty Period: 30 Months After The Date Of Delivery ]wider Curve Psc Sleeper Rt-8981 [ Warranty Period: 30 Months After The Date Of Delivery ]wider Curve P 2025-08-07
India Mmppna_23_24_282 (1)construction Of Tsangpool (telpong Tini Ali) To Dapathar Road From Ch. 0.00 Km To 1.80 Km (l 1.80 Km), (2)construction Of Dapathar To Basapathar Road Under Mukhya Mantrir Pakipath Nirman Achani For The Year 2023-24 2025-08-07
India Improvement With C.d. Works To Sh-467 Kajipod (kolamkhed) Road Vr-55 Km. 0/00 To 1/00 Tq. Kinwat Dist. Nanded 2025-08-07
India Improvements To Trimbak Road To Wasali Road Vr-07 Tal.dist. 2025-08-07
India Supply Of Inj.trastuzumab Deruxtecan 100mg (100mg/inj). Vials. #*. Inj.trastuzumab Deruxtecan 100mg (100mg/inj). Vials.[quantity Tolerance (+/-): 0 %age , Item Category : Normal , Total Po Value Variation Permitted: Max 8 Lacs] ] 2025-08-07
Whats app