Filter Search


Asia-Pacific


Location Summary Deadline
Australia Contract Awarded For Rectification Of Cladding On Building B782 rectification And Removal Of Cladding On Building B782.rectification Of Cladding On Building B782 2030-03-03
India Supply Of Axle Pulley Rubber Pad #*. Axle Pulley Rubber Pad For 4.5 Kw Alternator As Per Rdso Drg. No. Rdso/pe/sk/tl/0084-2005 Rev.-0 With Latest Alteration [ Warranty Period: 30 Months After The Date Of Delivery ] ] 2030-03-04
India Construction Of Liaisoning Office Along With Allied Development Works At Raipur On Turnkey Basis Including Maintenance For 5 Years During Defect Liability Period (dlp) 2030-03-04
Australia Contract Awarded For Replacement Of Austrade’s Frankfurt Post Printers office Supplies limited Tender.replacement Of Austrade’s Frankfurt Post Printers 2030-03-05
India Supply And Installation Of (-)860c Vertical Deep Freezer Laboratory Instruments And Equipments At Departmental Water Quality Testing Laboratories In Uttarakhand. 2030-03-05
India Planning, Design, Engineering, Construction, Fabrication, Supply, Erection, Trial Run And Commissioning Of 2 X 1000 Kva, 33/3.3 Kv Substation Which Includes All The Electrical Outdoor And Indoor Equipment, Lighting System, Earthing System, Lightning Prote 2030-03-05
India Transportation Of Indane Lpg Cylinders In Vertical Position On Unit Rate Basis Ex Korba Lpg Bottling Plant 2030-03-05
India Supply And Installation Of Laboratory Refrigerator Laboratory Instruments And Equipments At Departmental Water Quality Testing Laboratories In Uttarakhand. 2030-03-06
India Supply And Installation Of Turbidity Meter - Laboratory Instruments And Equipments At Departmental Water Quality Testing Laboratories In Uttarakhand. 2030-03-06
India Item Rate Contract For Supply And Installation Of Weighing Balance And Weighing Box Laboratory Instruments And Equipments At Departmental Water Quality Testing Laboratories In Uttarakhand. 2030-03-06
Whats app