Filter Search


Asia-Pacific


Location Summary Deadline
India Ae/pmn/96/24-25 Poyilthazham Mottakunnu Road Ward 12 Perumamma Gp #*. 96/24-25 Poyilthazham Mottakunnu Road Ward 12 Perumamma Gp 2025-09-21
India Ae/pmn/99/24-25 Thettathil Kurungotumal Road Ward 13 At Perumanna Gp #*. 99/24-25 Thettathil Kurungotumal Road Ward 13 At Perumanna Gp 2025-09-21
India Annual Plan Projects -kuthiathode Gp-58/25 Maintenance Of Anganwadi No 97 In Ward 5 #*. -annual Plan Projects 2024-25 ----kuthiathode Gp-58/25 Maintenance Of Anganwadi No 97 In Ward 5 2025-09-21
India Ae/pmn/351/24, Perumanna Panchayath, Panchayath Office Electrification #*. 351/24, Perumanna Panchayath, Panchayath Office Electrification 2025-09-21
India Supply Of Suction Pipe To Ftrtil #*. Supply Of Suction Pipe To Ftrtil Part No Ft0105239-001 For Trainset Vb Chair Car [ Warranty Period: 30 Months After The Date Of Delivery ] ] 2025-09-21
India Supply Of Oil Filter To M/s Repl Part No. S31 Or Oil Filter Assembly To M/s Ae Part No. G31. #*. Oil Filter To M/s Repl Part No. S31 Or Oil Filter Assembly To M/s Ae Part No. G31. [ Warranty Period: 30 Months After The Date Of Delivery ] ] 2025-09-21
India Supply Of Brake Block Assembly Without #*. Brake Block Assembly Without Brake Block To Rdso Drg. No.wd-88012-s-01, Alt.-8. Material And Specification As Per Drawing. [ Warranty Period: 30 Months After The Date Of Delivery ][quantity Tolerance (+/-): 5 %ag 2025-09-21
India Supply Of Set Of Items Consisting Of Two For Elgi Make Compressor #*. Set Of Items Consisting Of Two For Elgi Make Compressor Model Rr66101w For Hhp Diesel Locomotives As Details Given Below. (1) Kit Hp Piston With Pin & Circlip To Elgi Part No.072403979 2025-09-21
India Constructing Anganwadi Building No.2 At Village Aklad Tal. Dist. Dhule (under Head 2236-2371-31) 2025-09-21
India Supply Of 29171726: 3d Adjustable 360 Degree Rotational Modified Driver Seat For Three Phase Locomotives As Per Drg.no. 1211-01.131-001 Alt.2 2025-09-21
Whats app