Filter Search


Asia-Pacific


Location Summary Deadline
India Jal Jeevan Mission (jjm)-anjuthengu Panchayath - Phase 4-package1- Providing Fhtcs In Anjuthengu Grama Panchayath Pipeline Work 2025-09-16
India Annual Plan-koduvally Municipality-2024/25 (27/25)-(27/25) Various Road Works In Division No. 7-general Civil Work-annual Plan #*. Please Refer Tender Documents. 2025-09-16
India Natham Town Panchayat (turip 2024 2025 ) Strengthening Of Bt Road At 18th Ward Ayyapatti To Chellapanaikanpatti And 15th Ward Kalvelipatti River Road And Providing Paver Block Road With Drainage And Culvert At 15th Ward Kondayampatti Bagavathi Nag 2025-09-16
India General Karunagappally Priority Works 2023 24 Csind Renovation Of Pipe Boat Jetty In Alappad Panchayath In Karunagappally Lac 2025-09-16
India Supply Of Key Lock Relay Siemens #*. Supply Of Key Lock Relay With 1 No. K. 50 (ac Immunised) Relay To Work On 60v Dc With1 Ward And Key Make Siemens With Case Contact Configuration 5f/3b Siemens Or Similar [ Warranty Period: 30 Months After The Date Of D 2025-09-16
India Supply Of Intermediate Gear Bearing And Pinion Bearing For Aluminium Gear Case Of Wap-5. #*. Intermediate Gear Bearing And Pinion Bearing For Aluminium Gear Case Of Wap-5 As Per Clw's Drawing No. 1210-01.411-022, 1210-01.411-023. (a) Pinion Bearing, 798 C 2025-09-16
India Supply Of Over Hauling Kit For Brake Accelerator Valve Ftrtil Part No.790072105 For Lhb Coaches Consisting Of 15 Items. As Per Attached Annexure [ Warranty Period: 36 Months After The Date Of Delivery ] #*. Over Hauling Kit For Brake Accelerator Valve Ftr 2025-09-16
India Thottaramba Thodu Side Protection #*. Pro No 38/24-25 Thottaramba Thodu Side Protection Ward-30 2025-09-16
India Wbhf/nmc/store/ 2139 / Equipments 2025-09-16
India Pro No 103/24-25 -improvements To Thottumparambu Palam Road In Ward 13 2025-09-16
Whats app