Filter Search


Asia


Location Summary Deadline
India Annual Plan 2024-25 Nilambur Bp Proj No 272/24-25 Kuttikunnu Post Office Road Pathripadam Drainage Edakkara Gp 2025-07-18
India Supply Of 331616830016: Mil Grade Connectors For Speed Sensor Cables 4 Pin 90-degree Angle Male Connector Of M/s Suhas Part No.- Frgmrf8041s-p020vshs Or M/s Jetronics Part No. Rlb380214sp20(t20)fr Or Equivalent Make.note: 1 2025-07-18
India Supply Of 54540252: Wire Rope Steel Galvanised 19mm (3/4 Inch) Circumference Tensile Strength 95-110 Kg./sq.mm. 7 X 7/22 Swg I.e., Consisting Of 7 Strands Of 7 Wires Each 0.710 Mm Diameter., Each Coil Weighing Approximat 2025-07-18
India Supply Of 603286660018: Proportional Valve [part No:- Hyn25-rpe2-325.tdso728] Make : Plasser, Bosch Rexroth Accepted Make: Bosch Rexroth. 2025-07-18
India Construction Of Central Administrative Building At Ghatanji. 2025-07-18
India Annual Plan-2024-25 Devikulam Block - 50th Mile Road Concrete In Mankulam Gp-285/2024-25 2025-07-18
India Providing & Supplying Of Various Material Metal, Rcc Pipe, Murum, Providing & Fixing Information Sign Board In Jalkewadi To Morewasti Road & Gp Jalkewadi Tal. Karjat, Dist. 2025-07-18
India General Fund 2024-2025 #*. Construction Of Sockpit At New Irular Colony In Arani Town Panchayat 2025-07-18
China Contract Awarded For Dk20240252 Plot Project section Number: E3205711847000357001001 winning Bid Period (days): 883; project Location: South Of East Yan Road, West Hualin Street, West Hualin Street, West Of East Hualin Street..dk20240252 Plot Project 2025-07-18
India Supply Of 33508495: Hex.head Bolt M16x90-10.9 (ht) For Lhb/fiat Bogie As Per Specn.no.is:1364 (pt.1)/ 2018, Is 1367(pt.3)/2017, Ce Coating As Per Rcf/mdts %u2013 057 And The Item Should Be Procured From Rdso Approved Sou 2025-07-18
Whats app