Filter Search


Asia


Location Summary Deadline
India Annual Plan 2023-24 Construction Of School Building For Goverment U.p School Pothannur , Thavanur Lac Malappuram #*. The Total Area Of Construction In This Phase Is 308.80 Sqm Proposed Building Is Framed Structure Type With Individual R.c.c. Footing With 2025-07-10
India Intensive Patch Work From Km 18/8 To 24/0 Of Podalakur - Somasila Road In Spsr Nellore District. 2025-07-10
India Supply Of Junction Box Assly & Bodyside Floor Secondary Members For Wag- 9hc. #*. Junction Box Assly & Bodyside Floor Secondary Members For Wag-9hc, Drg.no : Ib051-00218 Alt-4; Ib051-00227 Alt-3; Ib031-00277 Alt-16 (each Set Consisting Of 03 Items As Per 2025-07-10
India Intensive Patch Work From Km 6/8 To 10/0 Of Atmakur - Hasanapuram Road In Spsr Nellore District. 2025-07-10
qty:9
>India
qty:9
>Supply Of Ahuja Pa Mixer Amplifier Tza 7000dp, Speaker Srx 250 Dxm, Mic Xr 1004h, Slide Pointer, Telephone M59
qty:9
qty:9
>2025-07-10
India Supply Of Race - Inner #*. Race - Inner As Per Drg.no.9563714 Alt.-bb [pl No. 16210050 ] As Per Drg.no.9563714 Alt Bb Specn: As Per Drg. [ Warranty Period: 30 Months After The Date Of Delivery ][quantity Tolerance (+/-): 5 %age , Item Category : Normal , 2025-07-10
India Intensive Patch Work From Km 0/0 To 10/0 Of A.s. Peta - Kothapalli Road (via) Abbasahebpeta In Spsr Nellore District. 2025-07-10
India 272/25 High School Road Irish Drain Tholur Gp 2025-07-10
India Intensive Patch Work (a) From Km 11/0 To 13/0 Of Ananthasagaram - Gangunta Road (b) From Km 3/0 To 6/0 Of A.s.road To Amanichiruvella (via) Vengampalli, Inagalur In Spsr Nellore District. 2025-07-10
qty:1
>India
qty:1
>Tender Invited For Fabricated Fully Machined Separator Top (hy-091 G) As Per Drg 16036201001/01 With Matl As Per Spe
qty:1
qty:1
>2025-07-10
Whats app