Filter Search


Asia


Location Summary Deadline
India Wbi -1 Board .#* Wbi -1 Board To Ftrtipl Part No:- Ft0029675-100 [ Warranty Period: 30 Months Aft er The Date Of Delivery ] ] 2027-03-23
Qatar Supply Of Pipes, Tubing And Metal Products On Long-term Agre 2027-03-23
India Denting Of Surface, Fitment Of Glass With Rubber Beads, Fitment Of Plastic Glass And Fitment Of Heavy Duty Locks Of Operator Cabin In Beml Bg825 Grader 7 Nos, Cranes 07nos. And Beml Tyre Handler 1no. For 2 Years At Amlohri Project. 2027-03-24
Bangladesh Contract Award For: Construction Of 1 Nos Feacl Sladge And 1 Nos. Solid Waste Management Planet /system At Narsingdi District. contract Value (taka): 209700000.000 no. Of Tenders/proposals Sold: 2 no. Of Tenders/proposals Received: 1 tenders/proposals 2027-03-24
Bangladesh Contract Award For: Piped Water Supply Scheme With 02 Nos Test Tubewell, 02 Nos Production Well, 02 Nos Pump House, 01 Nos R.c.c Over Head Water Tank, Mechanical Works, Electrical Works, Pipe Line/water Distribution Networks Etc. In Tangail Under Safe Wat 2027-03-24
Bangladesh Contract Award For: Piped Water Supply Scheme With 02 Nos Test Tubewell, 02 Nos Production Well, 02 Nos Pump House, 01 Nos R.c.c Over Head Water Tank, Mechanical Works, Electrical Works, Pipe Line/water Distribution Networks Etc. In Tangail Under Safe Wat 2027-03-24
Bangladesh Contract Award For: Piped Water Supply Scheme With 02 Nos Test Tubewell, 02 Nos Production Well, 02 Nos Pump House, 01 Nos R.c.c Over Head Water Tank, Mechanical Works, Electrical Works, Pipe Line/water Distribution Networks Etc. In Tangail Under Safe Wat 2027-03-24
Bangladesh Contract Award For: Horizontal Extension Of 01 Classroom (gr To 3rd Fl) & Vertical Extension Of Existing Academic Building At 1st Floor (remaining Work), 2nd & 3rd Floor With Staircase (1st To 3rd Fl) In/c Sanitary Water Supply & Electrification Works At 2027-03-24
India Jointing And Vulcanizing Of 48 Nos. Joint Of 6.6 Kv Trailing Cable In Two Years Of Drill Section Of Amlohri Project 2027-03-24
India The Work Of Material Collection And Deposition From Regional Store Amlohri, Central Store And Other Locations For Amlohri Draglines For 02 Years(626 Days) Except Sundays. 2027-03-24
Whats app