Filter Search


Asia


Location Summary Deadline
India Annual Plan-xiv-th Plan 2024-25 Of Porur Gp, 259, Plumbing Work Sockpit Wash Basin Construction In Karakkad Anganavadi 2025-07-13
India Manamboor Gp 2024-25 Construction Of Bottle Booth In Various Places (217/25) 2025-07-13
India Supply Of 45218742: Filter Media For Return Air Of Lloyd Electric Make Lhb Type Rmpu, Size:(1080x420x10) Mm Generally Conforming To Rdso's Drg. No. Rdso/pe/sk/ac/0073-2004 (rev.-1) And Rdso's Specn. No. Rdso/pe/spec./ac/ 2025-07-13
Bangladesh Contract Award For: Construction Of Rcc Cash Counter, Manager Chamber, 10 Mm Tempered Glass Door, Sliding Glass, One Way Vision Paper, Paneling, Glass With Branding Paper And Required Works Etc. As Per The Branding Manual For Janata Bank Plc., Mohanpur Br 2025-07-13
India Deposit-pvip-side Protection-side Protection To Damaged Canal Bund Near Ch 2/500 Of Puthencruz Md Near Puthencruz - Kollappady In Ward 8 Of Vadavucode - Puthencruz Gp -general Civil Work #*. Cc 1 3 6 40mm Concrete For Wall Foundation And Guard Stone Found 2025-07-13
India Providing Of Calibration Services - Calibration Of Frequency Meter; Calibration Of Frequency Meter; Nabl Labs, Any Other Government Approved Labs / Service Provider; As Per Buyer Requirenment 2025-07-13
India Pro No 739/24 Byepass Road Retarring D 21-of Tanur Municipality Under Annual Plan 2023-24 2025-07-13
Kuwait Tenders Are Invited For: Supply, Installation, Operation And Training On A Planetarium Telescope For The Observatory Laboratory - College Of Science - Physics Department - Kuwait University.supply, Installation, Operation And Training On A Planetarium Tel 2025-07-13
India Kaipamangalam Gp 2024-25, Project No.128/25, Ward 14 - Mahlara Madanikkulam Road Renovation 2025-07-13
India Supply Of Nose Pad Holder Liner #*. Nose Pad Holder Liner To Dlw Drg.no. 412v94450 Alt. B. [ Warranty Period: 30 Months After The Date Of Delivery ][quantity Tolerance (+/-): 5 %age , Item Category : Normal , Total Po Value Variation Permitted: Max 8lacs 2025-07-13
Whats app