Filter Search


Asia


Location Summary Deadline
Bangladesh Yearly Maintenance Of Air Cooler At Office, Control Room Of 7 & Dormetory #3. 2025-07-13
India Remaining Works Of Ccr, Drain, Footpath And Central Divider, Central Lighting Work Under Msavy Phase Ii From Nagar Parishad Culvert To Kurdigpura Phata As Per Dpr 2025-07-13
India Supply Of 25186619: Air Dryer Opto Coupler Pcb Assembly,ftil Part No.780 3540 00 2025-07-13
India Supply Of Flexible Conduit Nw-23, #*. Flexible Conduit Nw-23, With Metric Thread Without End Fittings To Rdso Specification No. Rdso/pe/spec/ac/0138-2009 Rev. 1. Specn: As Per Rdso Specification No.rdso/pe/spec/ac/0138-2009 Rev.1. [ Warranty Period: 30 Mo 2025-07-13
India Construction Of Gymnasium Hall At Village Talegaonrohi Tal Chandwad Dist. 2025-07-13
India Side Wall For Chalil Chelamkunnu Road-at Kodiyathur Gp-general Civil Work (re- Tender) 2025-07-13
India Supply Of Auxiliary Contacts Support Assly. With Six Switches For Pneumatic Contactorsto Clw Drg.no. 3twd.112.090 Alt-7(sheet No.1) And 4twd.112.090 Alt.-5 (sheet No. 0, 1 & 2) [ Warranty Period: 30 Months After The Date Of Delivery ] ] 2025-07-13
India Annual Plan-(2024-25) Porur Grama Panchayat, Pr.no.220/25, Arimbra Colony Drinking Water Project Rennovation-in Ward 1 2025-07-13
India Design, Engineering, Manufacturing, Procurement Of Materials And Bought Out Components, Assembly At Shop, Inspection Including Inspection By Tpia, Testing At Manufacturers Works, Packing, Supply Of Makeup And Recycle Gas Compressor With Accessories 2025-07-13
India Supply Of Various Type Of Construction Material, "6 Mm Metal Black-(crusher Broken Metal) With Royalty, ", Boulders Rubbles And Masonary Stones, Churi Dust, Sand River (unscreen) With Royalty, Sand (nallah Bed), Soft Murum With Royalty, Hard Murum With Ro 2025-07-13
Whats app