Filter Search


Asia


Location Summary Deadline
India Annual Plan-morayur Gp 2024-25, Project No 118/25-concrete Works To Chundakkat Mangat Road In Ward No 18 2025-07-12
India Egp20/24-25 Construction Of Chappath To Koonampala-chettayil Padi Road In Ward 12 2025-07-12
India Annual Plan - Muzhakunnu Gramapanchayath 2024-2025 Project No 35/2024-25-maintanance Work For Dileepan Smaraka Road , Ward-1 #*. Road Work 2025-07-12
India Supply Of Compressed Industrial Oxygen Gas For Cutting Conforming To Is:309/2005, 4th Revision With Amendment 01, Cylinder Capacity 7 Cubic Meter Each.. Shortage /accountal Statement As Per Annexure-a. [warranty Period: 30 Months After The Date Of Deliver 2025-07-12
-Qty-:-72
>India
-Qty-:-72
>Supply Of Digital Handheld Transceiver Set (handheld Radio) (q2)
Qty : 72
-Qty-:-72
>2025-07-12
India Supply Of Insulin Syringe 100-u 1ml With Needle 31g 0.25x8mm Individual #*. Insulin Syringe 100-u 1ml With Needle 31g 0.25x8mm Individual Ribbon Pack To Be Supplied In Instalments As Per Sterile Hypodermic Syringes And Sterile Hypodermic Syringes With Att 2025-07-12
India Cardiac Monitor With Defibrillator 2025-07-12
qty:107
>India
qty:107
>Supply Of Lv7/hrv Av-15 578-903-912-452-62 Jib Lifting Cylinder
qty:107
qty:107
>2025-07-12
India Pannimattom Mundackal Road Renovation 2025-07-12
India Supply Of Frame For Emergency Window To Rcf Drg No.dd 54103 #*. Frame For Emergency Window To Rcf Drg No.dd 54103, Alt-b, Color Of The Material Is Off White. Material & Specification As Per Drawing. [ Warranty Period: 30 Months After The Date Of Delivery 2025-07-12
Whats app