Filter Search


Asia


Location Summary Deadline
India Construction Work Of Ring Road Pac Rs. 3289.16 Lacs First Call On Road And Bridge Sor 25.03.22 Work Period 600 Days I/c Rainy Season. 2025-11-03
India Construction Of Major Bridge On Turati Bothi Sawargaon Kudla Bolsa Bhayegaon Sh-419 Km. 69/00 (near Bhayegaon Village) With Land Acquisition Tq. Umri Dist. (form - C) 2025-11-03
India Construction Of Major Bridge With Approaches On Talni Sapti Kohli Shirad Peva Unchegaon Bhanegaon Sh-361 Kothala Hadgaon Road Sh-416 Km 6/700 Tq. Hadgaon Dist. 2025-11-03
India Construction Of Major Bridge With Approaches And Land Acquisition On Wategaon To Karkhed Road Vr-125 Km 3/500 On Painganga River Village Tq. Hadgaon Dist.(actual Km-1/500) 2025-11-03
India Construction Of Joint Director, Higher Education Office Building At Tal. 2025-11-03
Bangladesh Construction Of 75.99m Long Khalishpur Bridge (2 X18.30m Rcc Girder + 36.58m Pc Girder) At 45th Km (ch.44+552 M) Of Chuadanga-darsana-jibannagar-kotchandpur-kaliganj Road (r-748) Under Road Division J 2025-11-03
India Supply Of 60110028bsl: Manufacture And Supply Of Elastic Rail Clips Mk-v Confirming To Rdso Drg.no.t-5919 Alt2(1atest Alteration) And Confirming To Irs Specification For Erc S. No. T-31-2021- Fifth Revision (with Amendment- 2025-11-03
India Supply Of Electric Overhead Traveling Crane 2025-11-03
India Jointing And Vulcanizing Of 70 Nos. Joints Of Trailing Cables, Rated- 6.6kv Of The 10 Cu M Shovels (pandh-1900al, Be-195 And 182m Marion), Nigahi Project 2025-11-03
India Oxidized Regenerated Cellulose Based Topical Absorbable Hemostat Surgicel Powder 3 Gram ] 2025-11-03
Whats app