Filter Search


Asia


Location Summary Deadline
China Contract Awarded For Modification_ Lami Process Equipment enhancing Production Capacity Project Of High-end It Display (phase 2) Hefei Xinsheng Optoelectronics Technology Co., Ltd 2025-05-20 10:00 2025-05-22 15:56 - 2025-05-27 23:59 2025-05-28 09:57.modi 2025-08-28
India Construction Of Concrete Road At Tamaswadi Tal Parola Dist Jalgaon (ts 602) 2025-08-28
India Const. Of Brick Paved Rasta From H/o Gurlal Singh At Village Dinarpur (hassanpur) Block Saha (sda) 2025-08-28
India Annual Plan-jp Pta 2024-25 Proj No 63/25 -mathirampalli Valanjilathu Padi Road Construction In Naranganam Ward 3 4- General Civil Work 2025-08-28
India Wbmscl/nit-71/2016 Dated- 06/12/2016 2025-08-28
India Supply Of 19014170: Bolt 1/2-20 Hex As Per Drg. No. 186342 Alt- Ba, Spec: Purchase Specification No. Misc:401 2025-08-28
qty:15
>India
qty:15
>Supply Of High End Desktop Computer (q2), Line Interactive Ups With Avr (v2) (q2), Multifunction Machine Mfm (v2) (q2)
qty:15
qty:15
>2025-08-28
India Keezhmad Gp- Project No. 199-24-25-pallithazam Road Retarring Ward19 2025-08-28
India Construction Of Awc Building At Jata Balisahi Of Oriya-birida G.p. 2025-08-28
India Supply Of 60110442: Special Rubber Pads Of 240mm Width, 10mm Thick Made Of Nylon Conveyor Belt Of 3 Ply, With Cover Thickness 5mm Minimum At Top And 1.5mm Minimum At Bottom Conforming To Is-1891 Part-1 (latest) M-24 Grad 2025-08-28
Whats app