Filter Search


Asia


Location Summary Deadline
India Monthly Basis Cab & Taxi Hiring Services - Suv; 3000kmx12 Months; Outstation 24*7 2025-07-01
India Supply Of Spindle Cam For Auto Valve #*. Spindle Cam With Tapper And Needle Bearing For Auto Valve Unit Of M/s.escorts Make Modular Brake Controller Type Esbc Iii (m) For Emu/memu As Per M/s.escorts Part/drg.no. 6357,6347 And 6350 [ Warranty Period: 30 Mo 2025-07-01
India Integrated Security Surveillance System Service - Remote Video Monitoring, Monitor Operations, Empl 2025-07-01
India Supply Of Polyamide Flexible Conduit #*. Polyamide Flexible Conduit Nominal Size - Nw17 Outer Dia.21.2+/- 0.2 Mm Without End Fittings As Per Annexure-a Table-a -1, Sr No. 3 Of Rdso Spec No. Rdso/ Pe/ Spec/ Ac/ 0138-2009 Rev.1 [ Warranty Period: 30 Months 2025-07-01
India Jungle Clearance To The Mdr Roads (3 Roads) In (r&b) Section, Kondapi (1) Tp Road To Mugachintala Via Gundlasamudram Road From Km.0/0 To 17/500 (2) Kuchipudi To Garlapeta Via Vemavaram Road From Km.0/0 To 12/540 (3) Ov Road To Juvvigunta Road Km.0/0 To 19 2025-07-01
India Intensive Patch Work To Ongole - Kothapatnam Road From Km.0/0 To 2/0 & Km.4/0 To 10/0 In Prakasam District 2025-07-01
India Construction Of New Additional Class Room School Building At Pums Ottanandal In T.kolathur Panchayat 2025-07-01
qty:1
>India
qty:1
>Supply Of Industrial Kitchen Chimney (q3)
qty:1
qty:1
>2025-07-01
India Supply Of Bracket Tube Cap 40mm [ri 2104-1] #*. Supply Of Bracket Tube Cap 40mm [ri 2104-1] Confirming To Rdso Drg. No. Eti/ohe/p/2104-1 Rev-a [ Warranty Period: 30 Months After The Date Of Delivery ] ] 2025-07-01
India Laying Of Gi Pipelines From D.no.16-274 To 17-279 In Division No.37 And D.no.10-997 To Vijayalakshmi Theater At Gokulam Street In Division No.39, Supply And Delivery Of Pannel Board In Ward No.41 For Maintenance Of Water Supply In Chittoor Municipal Corpo 2025-07-01
Whats app