Filter Search


Asia


Location Summary Deadline
India Supply Of 334326330019: Stainless Steel Hex Head Screw M12x35, Is:1367(pt-14/sec-1)2018, A2-70 Tab-2 And Plain Washer B14(2 Nos) Aisi-304 And Spring Lock Washer B12 Aisi-304 With Hexagon Nut M12 Is:1367(pt-14/sec-2)2018, A2- 2025-08-01
India Contract Awarded For 04740 - Construction Of The 2b Lot Of The Tyrrhenian Cycle Path - Cup F61b22001690004. Pnrr Project (m2c2 - Inv. 4.1). Assignment Assignment For The Custome Accommody award Amount: € 1.400,00 award Date: 09/05/2025.04740 - Constructio 2025-08-01
India Construction Of Resedential Quarter At P.h.c. Ajagarbahar Block- Korba Dist.-korba (c.g.) 2025-08-01
India 648- Construction Of Gate For Kalluvettamkuzhy Govthss At Kulathupuzha Pt 2025-08-01
India Supply Of 83030244: Paper-based Printing Services Brand: Printing-press-paper-based-printing-services (detailed Description/specification As Per Product # 1 Of Gem Contract No. Gemc-511687781897213 Dt.26/05/2025) 2025-08-01
India Supply Of 25606700: Inner Bearing Stopper (ce) For Hitachi Tm Hs 15250 As Per Hitachi Drg. No. 10t.806- 919 Rev.2 Alt-i 2025-08-01
India Supply Of 38165466: Cross Bar & Bracket For Brake Cylinder To Rdso Drg. No. Wd-80007-s-16 Alt-13, Item No. 1. Matl.&spec. As Per Drg. 2025-08-01
India Supply Of Hexagon Head Bolt M 20 X 100 #*. Hexagon Head Bolt M 20 X 100. Specn. Is: 1364(part-1)-2002-6.8. Threaded Length(b)=45, Cadmium Plated And Passivated As Per Is: 1572-1986. Classification Cd 8. [ Warranty Period: 30 Months After The Date Of Deliv 2025-08-01
Bangladesh Rehabilation Of Digdair Up-karpur Hat Via Mulbari Hat Road From Ch. 1660-2660m. Under Sonatala Upazila, District: Bogura. [road Id No. 110953014] 2025-08-01
India Pr To Talcher Town Road Such As Providing Sdbc From 2/500 To 2/750 And 3/665 To 4/465km 2025-08-01
Whats app