Filter Search


Asia


Location Summary Deadline
India Solar Based Single Village Scheme – Kadgaon & Badetopal(badetopal & Patelpara) Block- Antagarh District –kanker Vidhan Sabha – Antagarhtender Document 2025-07-29
India Pre–registration Work Of Class Ixth And Pre & Post Examination Processing Of High School, Higher Secondary, Diploma In Elementary Education And Diploma In Physical Education Examinationfor The Exam Year 2025 To 2027 2025-07-29
India Nit 904 Mmgsvy Road Renewal Maintenance Pkg No Mmgsy- Kndg-m-02, District- Kondagaon 2025-07-29
India Uipa Project At Nagar Palika Parishad Takhatpur 2025-07-29
India Providing, Laying, Jointing, Interconnection, Testing And Commissioning Of 63 Mm Dia & 75 Mm Dia Hdpe Pe-100 , Pn-6 Pipe , 65 Mm Dia Gi Pipe, Valve Specials And All Fittings Including All Allied Civil Works, , Providing Functional Household Tap Connectio 2025-07-29
India epc, Testing, Commissioning, Trial Run For 3 Months After It 9 Months Operation & Maintenance Including Replacement & Warranty Of All Components Of 1 Nos Stps Of Capacitiy 4.0 Mld With Sbr Technology Including Designing, P/l/l/j Of Rcc Np3 Pipes Intercep 2025-07-29
India Construction Work Of Cement Concrete Approach Road From Bich Khol To Aanganbadi At Village Sonthi Distt. Sakti (c.g) Rs 25.02 Lacs 2025-07-29
India Wmm & Bt Patch Repair Work Of Various Road Under Sub Division Lormi 2025-07-29
India Name Of Workdrilling Of 150 Mm Dia, 150 Mtr Depth, 50 Nos. Tube Well In Block Dabhara, Under Jal Jeevan Mission In District Sakti (c.g.) 2025-07-29
India Interior, Furniture, Artwork & Overall Development With Maintenance (3 Years) Of Tribal Museum At Tribal Research & Training Institute Sector 24, Nava Raipur, Atal Nagar, Chhattisgarh 2025-07-29
Whats app