Filter Search


Asia


Location Summary Deadline
India Providing Of Facility Management Services - Lumpsum Based - Part A As Per Tender Document; Part A As Per Tender Document; Consumables To Be Provided By Service Provider (inclusive In Contract Cost), Facility Management Services - Lumpsum Based - Part B As 2025-07-23
India Supply Of 166101550012: Cable Two Conductor - 20 Gauge To Blw Pl. No.18330253 And Emd Part No. 40019324 Conforming To Specification No.edps-179 Alt.f Or Latest For Wdg4/wdp4 Hhp Locomotives. Firm's Offer: Same As Above. Make 2025-07-23
India Supply Of 1.tc Muaip10#2 Module Assembly, 2.voltage Sensor For Dclv2 3. Mdb712 For Analog Distribution Unit 4. Mdmc Module Assembly #*. Voltage Sensor For Dclv2, Traction Inverter Uv, Vw Line Voltage As Per Medha Part No. Sp696901008 ]mdb712 For Analog Di 2025-07-23
India Pulisseri K V Road Improvement In Ward 15 Areekode Gp (485/25) 2025-07-23
India Renovation Of Kudumbasree Cds Office Pro No 133-24-25 2025-07-23
India Supply Of 659001740036: Supply, Testing And Commissioning Of Dissolved Gas Analyzer. Microprocessor Controlled Gas Chromatography System Withfcv/dfc/diffusion Proof Pressure Regulator For Dissolved Gases Analysis In Both Org 2025-07-23
India Contract Awarded For Delivery Of The Warranty Extension Service Together With The Technical Support Service For The Checkpoint 7000 Plus Appliance With Sandblast Cluster, Cisco Nexus And F5 Devices. 1. The Subject Of The Order Is The Supply Of Warranty Ex 2025-07-23
India Contract Awarded For Supply Of Active Ingredients Called "emizumab 105 Mg / 0.7 Ml Vialinjectable", "emizumab 150 Mg / 1 Ml Vial Injectable" And "emizizumab 60 Mg / 0.4 Ml Vial Injectable". the Object Of The Contract Is Determined By The Supply Of The Act 2025-07-23
India Contract Awarded For Calmip Supercomputer the Objective Of This Call For Tenders Is To Make Available To A Very Large Scientific And Technical Community A Calculation System Sized To Meet The Challenges Of Intensive Digital Simulation, Massive Data Proces 2025-07-23
India Contract Awarded For 31190744 Project String Brug A7 Neckerstraat research Has Shown That In The Original Design Of The Bridge In The A7 Over Neckerstraat (realization Bridge: 1973-1976) Too Little Reinforcement Has Been Applied In The Load-bearing Table 2025-07-23
Whats app