Filter Search


Asia


Location Summary Deadline
India Supply Of 29100021: Set Of Lateral Stop For Wag9/wap7 Locos As Per Clw Specification No. Clw/ms/3/ 010. Alt-nil And Clw Drg. No. 1209.01.315.021. Alt-1. (abb Drg. No.ib 016-00006 Qty. 4 Nos.). 2025-09-13
India Supply Of 82109187: Unbranded Piperacillin 4 Gm + Tazobactum 0.5 Gm Dry Powder Injection Brand: Na (detailed Description/specification As Per Product # 1 Of Gem Contract No. Gemc-511687732891558 Dt.15/07/2025) 2025-09-13
India Construction Of Main Gate At Bankim Sardar College At Taldi Under Canning-i Development Block. 2025-09-13
India Construction Of Additional Class Room At Girls Govt. High School In Ward No-07, Kamakhyanagar Nac #*. Construction Of Additional Class Room At Girls Govt. High School In Ward No-07, Kamakhyanagar Nac. 2025-09-13
India Under Voltage Release 220-240 V. .#* Under Voltage Release 220-240 V , 50 Hz As Per Cat No : Yu-1sda038312r1 Of M/s Abb Suit able For Being Fitted And Worked In Abb Make Air Circuit Breaker Of Lhb Type Eog Power Cars Conforming T o Rcf Specification No : 2025-09-13
Bangladesh Contract Award For: Improvement Of Kuichtara Purbopara Baitul Nur Jame Mosque Under Sadar Union, Upazila: Delduar, District:tangail. [latitude:24.0916254, Longitude: 89.5846476] contract Value (taka): 285000.000 no. Of Tenders/proposals Sold: 24 no. Of 2025-09-13
India Contract Award For: Installation Of Deep Tube Well (100x38) Mm With Submersible Pump Under Revenue Budget Of Department Of Public Health Engineering In Feni District. During The Fiscal Year 2024-2025. contract Value (taka): 726817.319 no. Of Tenders/pro 2025-09-13
India Supply Of Gi Nipple #*. Gi Nipple 15 X 75 Mm As Per Is: 1239 (pt-l) 2004 [ Warranty Period: 30 Months After The Date Of Delivery ] ] 2025-09-13
India Supply Of Torque Wrench #*. Torque Wrench Having Range From 80-400 N-m With Accuracy +- 3% And Suitable. Supplied With 3/4 Inch Square Drive. Toque Wrench Should Be Light In Weight (approx 2 Kg) And Length Not More Than 700 Mm. Also Complying To Iso 6789- 2025-09-13
Bangladesh Contract Award For: A. Construction Of Cc Road From Nalitabari -gazirkhamar Bc Road To H/o Golam Kibria Maksim At Ward No 3 Under Nalitabari Pourashava, Dish- Sherpur( Ch0.00-97.00m) B. Estimated For Need Based Playing Accessories ( Balancing, Haniging Ri 2025-09-13
Whats app