Filter Search


Asia


Location Summary Deadline
Bangladesh Contract Award For: Repair & Maintenance Of Different Launch Ghat With Allied Works Under Biwta, Barishal Division, Barishal. contract Value (taka): 874206.626 no. Of Tenders/proposals Sold: 95 no. Of Tenders/proposals Received: 92 tenders/proposals R 2026-06-16
India Copper Crimping Socket, 4 Sqmm (mild) Copper Crimping Socket 4 Sq. Mm. etc. .#* Copper Crimping Socket, 4 Sq. Mm.(mild) As Per Cat. Ref. Psd-7619 Of M/s. Dowells Or Si milar. [ Warranty Period: 30 Months After The Date Of Delivery ] [quantity Tolerance (+ 2026-06-16
India Contract Award For: Re-excavation Of Canal/khal 11.480 Km., Rehabilitation Of Outlet 5 Nos, River Bank Protective Works 0.600 Km And Construction Of 1 No Wmo Building In C/w Chitra-bhairab-afra Sub-project (narail Part) Under Narail Wd. Division, Bwdb, Na 2026-06-16
India Annual Maintenance And Repair Contract For 2 Nos. Air Conditioner Fitted At Pc2000 (exc-2997) Hydraulic Shovel. 2026-06-16
Bangladesh Contract Award For: Supply, Installation, Testing And Commissioning Of 2 Nos 60 Kva Diesel Generator [1 (one) For 5 (five) Storied 164 Beded Boys Hostel Building And 1 (one) For 5 (five) Storied 152 Beded Girls Hostel Building At Govt. Josimuddin Kazi Abd 2026-06-16
India Annual Maintenance Contract For 3 Nos. Air Conditioner Fitted At Tata-hitachi Ex1900vi (exc-2776) And 01 No. Air Conditioner Fitted At Tata-hitachi 650-i (exc-3143) Hydraulic Shovels Working At Bina Project 2026-06-16
India Tender Invited For Gate Drive Unit Dytp 150a As Per Material Id No #*. Gate Drive Unit Dytp 150a As Per Material Id No. : 3est 113-793 , Suitable For Bombardier Make Tc & Prp System Of Wag9 Loco [ Warranty Period: 30 Months After The Date Of Delivery ][qu 2026-06-16
India Design, Engineering, Manufacturing, Procurement Of Materials And Bought Out Components, Assembly At Shop, Testing At Manufacturers Works, Inspection By Tpia, Packing, Supply Of Control Valves (butterfly). 2026-06-16
India Contract Award For: Repair & Maintenance Of Vrf Air Conditioner System Including Supply Of Necessary Spare Parts On Frame Work Contract Basis At Nagar Bhaban, Dhaka North City Corporation, Gulshan-2, Dhaka (fy-2024-2025). ) contract Value (taka): 5397698 2026-06-16
India Kochi Municipal Corporation Fce1 190 24 Balance Work Fo Ray Project G 11 Building In Thuruthy Division 2 2026-06-16
Whats app