Filter Search


Asia


Location Summary Deadline
India The Supply & Instalation Work Of Tubular Pole Street Light At Ward No. 07 From Ma Chandrahasini Mandir To Bus Stand Wellcom Gate, From Nishad House To Shankar Mandir. 2025-07-29
India Ward No 08 Construction Of Mahatma Gandhi Urban Indusrtial Park (uipa) At N.p.p. Ahiwara ( 1 St Call ) 2025-07-29
India Construction,testing And Commissioning Of R.c.c. Elevated Service Reservoir Of 40kl(01nos)capacities &staging 12 Mt& Steel Structural Based Pe Tank Of Capacity 10 Kl/12 M Staging (01 Nos) In Including Providing And Fixing Of Ci Double Flange Pipe, Double 2025-07-29
Oman Contract Awarded For Supply Carpentry Materials.supply Carpentry Materials 2025-07-29
India Providing, Laying, Jointing, Testing Andcommissioning Of 63 & 75 Mm Dia Hdpe Pe-100,pn-6 2894mtr.& 65&80 Mm Dia G.i. Pipe 100mtr.& Providing Connection In House Hold And Public Institutions-63nos With Valve Specials And All Fitting I/c All Allied Civil Wo 2025-07-29
India ????? ???.-23 ??????? ??? ????? ??? ???? ?? ???? ????? ??? ?????????? ??? ???? ??????? ??????(??????? ??????) 2025-07-29
India B.t. Renewal Of Sakri Hafa Road Length 1.50 Km, Indira Awas Ameri Road Length 1.50 Km, Chhatauna Sakarra Road Length Km 1/6 To 3/10 = 2.6 Km, 2nd Battalion Residential Colony Sakri Length 2.50 Km And Uslapur Railway Station Approach Road Length 0.80 Kmsub 2025-07-29
India Construction Of Different Types Of Works Under Haat Bazar Scheme In Village Nagpura In Vidhansabha Area Gramin Durg Distt-durg 2025-07-29
India Nit 948 Cons. &main. Pm-janman Rural Connectivity Batch-i , Pkg No Cg 07-103 District-jashpur 2025-07-29
India Construction Of Kukurdi (amaldiha ) Anicut On Shivnath River. 2025-07-29
Whats app