Filter Search


Asia


Location Summary Deadline
India B.t.patch Repair Work Village Road On Matipahad Charra Road Length 3.00 Km. Bokhi Lakraghara Road Length 3.50 Km. And Ankira Approach Road Length 1.80 Km. Under Pwd Sub Division No. 1 Pathalgaon Distt Jashpur. 2025-07-29
India Ward No. 13 Indira Garden To Government Collage Divider Construction. 2025-07-29
India Wmm, Bt Patch Repair, Drain & Shoulder Repair Work Under Bhaisma Sub Division 2025-07-29
India ?????-11 ????????? ?????? ??? ?? ???????? ??? ?? ???? ?? ?????? ??? ????? ????? ?? ?????? 2025-07-29
India Bt Renewal Work Of 1. Raghunathnagar To Langri Road In Km. 1 To 5/5 = 4.50 K.m. 2. Alka Kachhiya Manpur Road In Km. 1 To 3 Under Sub Division Wadrafnagar Division Ramanujganj 2025-07-29
India Providing, Laying, Jointing, Interconnection, Testing And Commissioning Of 63 Mm Dia & 75 Mm Dia Hdpe Pe-100 , Pn-6 Pipe , 65 Mm Dia Gi Pipe, Valve Specials And All Fittings Including All Allied Civil Works, , Providing Functional Household Tap Connectio 2025-07-29
India Single Village Scheme – Rampurblock- Koylibedadistrict –kankervidhan Sabha – Antagarhtender Document 2025-07-29
India Transportation Of Paddy/food Grains And Other Commoditiesfor Kms 2023-24 2025-07-29
India Drilling Of 150 Mm Dia, 120 Mtr Depth, 59 Nos. Tube Well Inblock Fingeshwar-i, Under Jal Jeevan Mission In District Gariyaband. 2025-07-29
India Nit 948 Cons. &main. Pm-janman Rural Connectivity Batch-i ,pkg No Cg 15-303 District- Rajnandgaon 2025-07-29
Whats app