Filter Search


Asia


Location Summary Deadline
India Construction Of Road From (1) Machkhowa Gp To Borpak Guwaldoi Road (l=2.83 Km) & (2) Machkhowa Dhakuakhana- Pwd To Borpak Jiamoria Gaon (l=2.25 Km) Under Mukhya Mantrir Pakipath Nirman Achani For The Year 2023-24 2025-07-25
India Vvip Cab And Taxi Hiring Service-short Term - Luxury Sedan; Audi; 12 Hrs And 200 Km,vvip Cab And Ta 2025-07-25
India Construction Of One Unit Boys Toilet At Bahadurpur High School And One Unit Boys Toilet At Nayansukh Lnsm High School Under Farakka Block 2025-07-25
India Kallerikkal Thayyil Road Concrete 2025-07-25
India Contract Awarded For Framework Contract For The Delivery Of A Plant Protection Product Beloukha With The Active Ingredient Pelargonic Acid framework Contract For The Delivery Of A Plant Protection Product Beloukha With The Active Ingredient Pelargonic Aci 2025-07-25
India Supply Of Abbott Total Protein Reagent.800 Tests Of Abbott Total Protein In One Pack Containing R1 (4 X19.6ml) [ Warranty Period: 30 Months After The Date Of Delivery ] 2025-07-25
India Providing Erecting & Commissioning Of Ups As An Emergency Back Up For Icu No. 15, 16 & 22 At Shri Bhausaheb Hire Govt. Medical College And Sarvopchar Rugnalay Dhule Tal & Dist. 2025-07-25
India 12.1 Widening And Improvements To Nh 166 To Yelane Koparde Sambu Shirgaon Savate Road Mdr 4 K.m.0.00 To 7.00 Tal Shahuwadi Dist . 2025-07-25
India Supply Of 31xxn01: Earthing Cable Atc Conductor For Demu Both Side Single Hole Copper Lug For 700 Hp Traction Motor, Bhel Cat/drg. No. 453130001, Make: - Bhel Or Equivalent. Make - Self 2025-07-25
India Supply Of 230101540014: Bus Bar Support(epoxy) Insulator As Per Drg. No. Wr/brcy/el/in/008. 2025-07-25
Whats app