Filter Search


Asia


Location Summary Deadline
India Supply Of 82021454: Oint Clobetasol Propionate 0.05% + Salicylic Acid 3%20 Gm Tubes Medisole Ointment-20gm 2025-07-14
India Proj.no.293 25 Division 24 Interlocking At Kochuveed Road Concreting And Maintenance Work On Opposite Puthanchanta Workshop Road To Bungalow At Udayamkot Road- Banglavil Bylane Near Parankimamvila Anganavadi Bylane Champakulam 2025-07-14
India Supply Of Circuit Board Assembly #*. Circuit Board Assembly For Air Dryer Of M/s. Knorr Bremse Model Ltz-015-2, And Kbi Pt.no.stn 26403 T 11003. [ Warranty Period: 30 Months After The Date Of Delivery ] ] 2025-07-14
India Repairs To Borja Shideshwar Durchuna Road Km No 0-00 To 3-00 Tq. Aundha Dist Hingoli Asphalt Hot Mix 2025-07-14
India Extension Of Pvc Pipe Line Of Different L.i. Schemes Under Kumarghat Block During The Year 2024 25. 2025-07-14
India High Speed Diesel 2025-07-14
Oman Contract Awarded For Supply And Installation Of Automatic Barriers For The Department Of Social Development Building In Al-buraimi And Al-wafa Center For The Rehabilitation Of Persons With Disabilities In Al-buraimi.supply And Installation Of Automatic Ba 2025-07-14
Oman Contract Awarded For Replacements Of Circuit Breakers And Changeover Switch At Ibra Hospital In North Al Sharqiyah Governorate.replacements Of Circuit Breakers And Changeover Switch At Ibra Hospital In North Al Sharqiyah Governorate 2025-07-14
India Supply Of 309800620014: Fast Steel Epoxy Stick Of 114 Grams (04 Ounce) Pack Of Z801 Stanvac Chemicals Or 30601 Auto Weld Of Superon Schweeisstechnik Or Corrium 4060 Rapid Repair. Material To Be Procured From Oem Or Their Aut 2025-07-14
India Construction Of Jamsai Jhinjru Bahi Ropari Banerdi Rachot Sandao Dharjol Up To Chowk Km 0/0 To 08/500 Under Nabard #*. Removal Of Formation Deficiencies, R/wall, B/wall, Cross Drainage Work, Metaling And Tarring, Crash Barrier, Parapets, Drain And Providi 2025-07-14
Whats app