Filter Search


Asia


Location Summary Deadline
India Niet-64/23-24/01 2026-05-03
India Supply Of 601602350080: Procurement Of Manufacturing And Supply Of Thick Web Switch Expansion Joint (twsej) 60 Kg. As Per Rdso Drg. No.t-8822(alt02) As Per Irs:t-10 With Latest Alteration As On Date Of Closing Of The Tender. 2026-05-03
Bangladesh Contract Award For: Improvement Of Balashpur Road. (ch. 0m-780m) Under Sadar Upazila, District: Laxmipur, Id No: 451435024 Salvage Cost (tk.): 1,26,598.00 [laxmipur-s] contract Value (taka): 9523391.850 no. Of Tenders/proposals Sold: 117 no. Of Tenders 2026-05-03
India 1.ebv Display 2.kit For Mver Pov Port. .#* Ebv Display (m/s.kbil Part No. 775354) For Ccb System. ] 2026-05-03
India Annual Maintenance Contract Of B. G. Railway Siding In The Mormugao Port Area For A Period Of Two Years (2024 And 2025) For 52 Kg / 60 Kg Rail Tracks 2026-05-03
Bangladesh Contract Award For: Improvement Of Tambulkhana Tulagram Purbopara Eidgha Under Kuijuri Union,upazila:sadar. [latitude 23.556943, Longitude 89.821137] contract Value (taka): 475000.000 no. Of Tenders/proposals Sold: 31 no. Of Tenders/proposals Received: 2026-05-03
Bangladesh Contract Award For: Improvement Of Dadpur South Bissaspara Jame Mosque Under Dadpur Union,upazila:boalmari. [latitude:23.4247898, Longitude:89.7132181] contract Value (taka): 297269.250 no. Of Tenders/proposals Sold: 18 no. Of Tenders/proposals Receive 2026-05-03
India Tender Invite For Complete Gear Wheel And Axle Suspension Tube Assembly (msu) (along With Spare Parts) For, M/s:- Medha Make Motor Coach Wheel Sets (gear Drive Type Gft 1-45-382b) As Per Annexure C (1 Set= 41 Items) [ Warranty Period: 30 Months After The 2026-05-03
India Annual Plan-morayur Gp 2024-25, Project No 51/25-re Taring Works To Mongam Karuthedath Palliyali Road In Ward No 07 2026-05-03
India Set Of Spares Required For Ganz Type Smgr Ae Make .#* Set Of Spares Required For Ganz Type Smgr Ae Make - 1 Set Consisting Of 13 Items 13 Nos As per Annexure Enclosed [ Warranty Period: 30 Months After The Date Of Delivery ] [quantity Tolerance (+/-): 5 % 2026-05-03
Whats app