Filter Search


Asia


Location Summary Deadline
India Construction Of Trumpet Interchange Connecting Bangalore Chennai Greenfield Expressway From (km 261.705 To Km 262.794) With Maduravoyal To Wallajapet Section Of Nh48 Near Sriperumbudur Toll Plaza At Km 35.700 In Tamil Nadu Under Bharatmala (2nd Call) 2025-07-09
India Bondmaster 600 Bond Testing Flaw Detector 2025-07-09
India Constructing R.c.c. Water Tank And Pipeline At Kosurde V.p.kosurde And Providing Well Jali And Platform Around Well At Kosurde V.p.kosurde Tal Kalwan Dist Nashik Pin Code-423501 2025-07-09
India Supply Of Seal O Ring #*. Seal O Ring As Per Drg.no. 8198078 Alt Ba As Per Specn. Purchase Specification No.misc.-376 Rev. Nil Dated 07.04.16 [ Warranty Period: 30 Months After The Date Of Delivery ][quantity Tolerance (+/-): 5 %age , Item Category : Norm 2025-07-09
India Fdr Restoration Of Different Flood Damaged M.i. Schemes Under Salema Block Of W.r Sub Division Kamalpur During The Year 2024 25 S.h Restoration Of Electrical Equipment And Maintenance Of Pump Motor Suction Delivery And Other Allied Works Etc. 2025-07-09
India Construction Of Interloking Road In Ward No 15 From Shop Of Dr Khaleeq To Saleem Lassi Wala Side Patri Kithore Distt Meerut 2025-07-09
India Hiring Of Milk Transportation Vehicle For Shyodanpura Route At Mcc Nohar #* Hiring Of Transport Vehicle 2025-07-09
India C/o Road From Lt Road To Gomshing Via Kungba Up Gradation (pmgsy-iii) 2025-07-09
-200-Kva-Up-To-And-Including-2500-Kva>India -200-Kva-Up-To-And-Including-2500-Kva>Distribution Transformer, 3 Phase, 11 Kv > 200 Kva Up To And Including 2500 Kva -200-Kva-Up-To-And-Including-2500-Kva>2025-07-09
India Supply Of Steel Tubes-galvd.isi Marked To Is:1239/pt-1/2004 In Rendom Lengths Of 4-7 Mtrs.screwed At Both Ends As Per Is:554:1999, Socketed At One End & Other End Protected With Plastic Protector Nominal Bore 15mm Heavy Classes. #*. Steel Tubes-galvd.isi 2025-07-09
Whats app