Filter Search


Asia


Location Summary Deadline
India Tender Invited For Supply And Installation #*. Supply And Installation Of Items As Per Attached Annexure Required For Implementation Of Modification As Per Drg No. S.c.r./c & W Sk No.1251/c [ Warranty Period: 30 Months After The Date Of Delivery ] ] 2025-09-05
India Syrup Ambroxol (30 Mg /5 Ml ) + Levosalbutamol/ Levalbuterol (1 Mg/5ml) +guaiphenesin (50 Mg/5 Ml)+ In 100 Ml Bottle .#* Syrup Ambroxol (30 Mg /5 Ml ) + Levosalbutamol/ Levalbuterol (1 Mg/5ml) +guaiphene sin (50 Mg/5 Ml)+ In 100 Ml Bottle ] 2025-09-05
India Lower Spring Beam For Ac Coaches Etc .#* Lower Spring Beam For Ac Coaches. Drawing No. : Icfs Drg. No. Wlrrm-0-5-002, Alt. H / 7, Col. Iii. Material And Specification : As Per Drawing. [ Warranty Period: 30 Months After The Date Of delivery ] [quantity To 2025-09-05
India Supply Of 430511670015: Ac Clamp Meter, 1000 A, Cat Iii As Per Specification No. Mrts/el-m/2023-24/ac Clamp Meter,1000a 2025-09-05
India Door Hand Hold For Flap Door Of Boxn Wag .#* Door Hand Hold For Flap Door Of Boxn Wagon To Irs Drg No.w/ml-6 Alt.3 & M aterial To Is:2062-2011, Amdt.1 Of Nov 2012 Gr.e 250 A. [ Warranty Period: 30 Months After The date Of Delivery ] ] 2025-09-05
China Contract Awarded For Full Spectrum Direct Reading Spectrometer, Portable Direct Reading Spectrometer, Metallographic Microscope, X-ray Diffractometer the First Batch Of Testing Equipment Procurement Project Of Qingdao High End Bearing Research Institute 2025-09-05
India Constructi On Of Cc Road And Drain With Cover Slab From Fish Market To Jiyaul Gaji House At Sansad No- X Under Bankra-i G.p, Domjur, Howrah (id No- 112658139) 2025-09-05
qty:6
>India
qty:6
>Tender Invited For Deutz Coolant 20ltr
qty:6
qty:6
>2025-09-05
-Qty-:-1
>India
-Qty-:-1
>Tender Invited For Custom Bid For Services - Providing Services For Line Jobs And Cylinder Handling Works At Jalgaon Lpg Plant
Qty : 1
-Qty-:-1
>2025-09-05
India Tenders Are Invited For Allocation Of Planning And Construction Work For The New Construction Of The District House (construction Phase 1) In Künzelsau - Participation Competition.allocation Of Planning And Construction Work For The New Construction Of Th 2025-09-05
Whats app