Filter Search


Asia


Location Summary Deadline
India Supply Of 725804430277: Supply And Installation Of Solar Operated Cloud Base Anemometer Including Smart Iot With Remote Logging And Alerts As Per Specification (annexure - A) Attached. Make Brand: Kp Infratech Or Eltech Mak 2025-07-10
Bangladesh Construction/ Improvement Of Roads 5,661m In 7 Locations, Rcc Cross Drains Nineteen (19) Nos. (size: 1m X 1m), Protection Work 194m, & Installation Of Street Lights 379 Nos. At Monohardi Paurashava, D 2025-07-10
India Tender Invited For Cement All Other Specification As Per Rfp, Stone Boulder All Other Specification As Per Rfp, Coarse Aggregate All Other Specification As Per Rfp, Coarse S Free From Vegetation All Other Specification As Per Rfp, Water Proofing Compound 2025-07-10
India Supply Of 652810001061: 110 Volt Circular Saw 110 Mm Machine. Make: Makita, Bosch And Hilti Technical Specification:- @power Input: 1200 W @power Supply: 110 V @no-load Speed: 13000 Rpm @blade Diameter: 110 M 2025-07-10
India Supply Of 1617n222: Driver Seat Assembly As Per Clw Drg.no. 05/1/38/44 Alt 9. Firm Accepted Make: Self 2025-07-10
India Intensive Patch Work From Km 0/0 To 15/970 Of P.s. Road To Chintalatmakur (via) Verubotlapalli, Kesamanenipalli Road In Spsr District. 2025-07-10
India Raising Of Boundary Wall,p/f Of Shed, Ms Gate, Painting Etc In Shivpuri Shamshanghat Committee Rutoane W.no.14 2025-07-10
India Supply Of "surge Arrestor (pos No-9). #*. "surge Arrestor (pos No-9) As Per Clw Specn.no.clw/es/3/0016 Or Latest And Clw Drg No-clw/es/3/sk1/0016 Or Latest And Clw/es/3/sk2/0016 Or Latest" [ Warranty Period: 30 Months After The Date Of Delivery ] ] 2025-07-10
India Supply Of Compressed Oxygen Gas Conform To Is: 309/2005( Fourth Revision ) [ Warranty Period: 30 Months After The Date Of Delivery ] 2025-07-10
India Supply Of Combined Feed Exchanger - Lot 1for P-25 Project (epcm-2) At Iocl Panipat Refinery 2025-07-10
Whats app