Filter Search


Asia


Location Summary Deadline
India Supply Of 33552034: One Coach Set Of Roof Assembly For Lscn/bw2 (753)for Frp Panel Feature 1) Roof Assembly Complete To Drg No 75316001 Alt 'nil' - 1 No 2) End Roof Assembly To Drg No. 58116066 Alt 'g' - 2 Nos. 3) Wel 2026-03-31
India Supply Of Underframe Arrangement For Emu Trailer C Coach #*. Underframe Arrangement For Emu Trailer C Coach To Drg. No.(573)icf/mrvc/c/bt-1-1-001, Alt 'g'. The Manufacturing Facility As Per Icf/md/spec-147, Issue Status-01, Rev.02 With Amendment No.01. Sp 2026-03-31
India Electrical M And R - Hisar Ro 2026-03-31
India Supply Of 92111002: High Speed Diesel Oil Conforming To Is 1460-2000, Amendment No.1 Jan2003/ 4th Revision, (euro Iii) Method Of Testing As Per Astm D 4294/ip336 2026-03-31
India Supply Of 81908337: Graphite Mould Blanks: 1224 Mm Dia X 575 Mm Height (48.2" X 22.6" ) As Per Rwp Specification No. Rwp/m/specn-1/016/2018 Alt 'nil' Part-ii. 2026-03-31
India Supply Installation Construction Maintenance And Handing Over To Maintenance Body Of Rising Main Pump House Oht Distribution System All Electrical And Mechanical Works And Other Works At Thithaula Khempur Water Supply Scheme 2026-03-31
Bhutan Contract Awarded For: Construction Of Rcc Culvert/footpath At Darla Hss Under Phuntsholing Dungkhag. Construction Of Rcc Culvert/footpath At Darla Hss Under Phuntsholing Dungkhag. Contract Value (nu.): 942775.400 Date Of Letter Of Acceptance: 22-oct-2025 2026-03-31
India Supply Of Epoxy Metal Primer And Thinner For Fiat Bogie #*. Set Of Epoxy Metal Primer And Thinner For Fiat Bogie As Per Drg.no. Mplfiatpt Ver. 10, Packing Instruction - Pi042 [ Warranty Period: 30 Months After The Date Of Delivery ] 2026-03-31
India Osimertinib 80 Mg Tab .#* Srphc065284-osimertinib 80 Mg Tab Unit:tab [quantity Tolerance (+/-): 5 %age , Item Category : Normal , Total Po Value Variation Permitted: Ma x 8 Lacs ] ] 2026-03-31
India Amc Of Ihc Ups (6x10 Kva) Installed At Ireda Registered Office 2026-03-31
Whats app