Filter Search


Asia


Location Summary Deadline
Bangladesh Contract Award For: At Ssae/works/kyto Section: Construction Of Bank Protection Wall (1200 Feet Length) At Km 361/0-3 To 362/0-1 And Repairs To Cess & Bank By Earth Filling From Railway Land Including Of Ballast Wall At Both Approach Of Bridge No-229 (3x4 2026-03-31
Bangladesh Supply Of 250mm Outer Dia Upvc Pipe And Moulded Fittings. 2026-03-31
India Supply Of Steel Blooms 300 Mm Sq For Forging Lhb/fiat Bogie Axles To Irs R-16/95 As Per Rwf Secification No. Rwf/m/specn-1/128/2021 Alt.- Nil. Specn: Rwf/m/specn-1/128/2021 Alt.- Nil] 2026-03-31
India Supply Of Underframe Arrangement For Emu Trailer C Coach #*. Underframe Arrangement For Emu Trailer C Coach To Drg. No.(573)icf/mrvc/c/bt-1-1-001, Alt 'g'. The Manufacturing Facility As Per Icf/md/spec-147, Issue Status-01, Rev.02 With Amendment No.01. Sp 2026-03-31
India Valve-1/4 Relief .#* Valve-1/4 Relief As Per Drg.no. 40047147 Alt A Specn: Purchase Specification No- Misc:616 rev.nil [ Warranty Period: 30 Months After The Date Of Delivery ] [quantity Tolerance (+/-): 5 %age , Item Category : Normal , Total Po Value Va 2026-03-31
India Supply Of Roof, Sidewall And End Wall For Amrit Bharat Lscn/pp2 #*. One Coach Set Of Roof, Sidewall And End Wall For Amrit Bharat Lscn/pp2 (755) 1) Roof Assembly Complete To Drg No 75516001, Alt "nil" - 1 No, 2) End Roof Assembly To Drg No 97216008, Alt " 2026-03-31
India Supply Of 31020914: Solid Forged Wheel (rough Machined) For Vb Train Set Trailer Coaches To Drg. No. Aaa02173 Item-1 Alt Nil. 2026-03-31
India Distance Bolt .#* Distance Bolt For Panel Section For Wag-9hc Loco Specn: Clw-es-3-184 Alt-g. [each Set consisting Of 02 (two) Items As Per Set Details Attached] [ Warranty Period: 72 Months After The Dat e Of Delivery ] [quantity Tolerance (+/-): 5 %age 2026-03-31
India Supply Of Set Of Panels To Edts-355 #*. Set Of Panels To Edts-355, Rev-1. Amdt-1,2 & 6 With Icf Annexure No.1, 2 & 3. Note: 1. In Icf Annexure -3 A)drg. No. Icf/sk3-7-2-047 Shall Be Read As Icf/sk3-7-2-047 Alt-f Or Latest. B)the 4 Nos.mpcb In Bom At Sl.no 2026-03-31
India Supply Of Roof, Sidewall And End Wall For Amrit Bharat Lscn/pp2 #*. One Coach Set Of Roof, Sidewall And End Wall For Amrit Bharat Lscn/pp2 (755) 1) Roof Assembly Complete To Drg No 75516001, Alt "nil" - 1 No, 2) End Roof Assembly To Drg No 97216008, Alt " 2026-03-31
Whats app