Filter Search


Asia


Location Summary Deadline
India Supply Of Overhauling Kit For Lru, Control Portion, 20-pipe (20 Cp) Knorr Pt.no.787775 - 2004 Of Micro Processor Controlled Based Air Brake System Ccb-ii For Hhp Loco's. #*. Overhauling Kit For Lru, Control Portion, 20-pipe (20 Cp) Knorr Pt.no.787775 - 20 2025-07-21
India Supply Of Overhauling Kit For Lru, Control Portion, Bc (bc-cp) To Knorr Part No. 789009 Of Micro Processor Controlled Air Brake System For Ccb-ii Of Hhp Loco's. Kbil Kit No- Xki/kit/02585 Kit Consisting Of 39 #*. Overhauling Kit For Lru, Control Portion, 2025-07-21
India Supply Of Overhauling Kit For Lru, Control Portion; Er (er-cp), Knorr Pt.no.788753- 2004 Of Micro Processor Controlled Based Air Brake System Ccb-ii For Hhp Diesel Locomotives, Kbi Kit No-xki/kit/01578. Kit Consisting Of 68 Items #*. Overhauling Kit For L 2025-07-21
India Supply Of Overhauling Kit For Electronic Brake Valve Cab-1 To Kbi Part No 787452-2004 Consisting Of 47 Items As Per Annexure Attached. #*. Overhauling Kit For Electronic Brake Valve Cab-1 To Kbi Part No 787452-2004 Consisting Of 47 Items As Per Annexure A 2025-07-21
India Supply Of Fibre Optic Cable Cru To Bvc1 To Nyab Part No.-775218 Knorr-bremse Part No.- 775218. #*. Fibre Optic Cable Cru To Bvc1 To Nyab Part No.-775218 Knorr-bremse Part No.-775218. [ Warranty Period: 30 Months After The Date Of Delivery ] ] 2025-07-21
India Supply Of Spring Plate For M/s Elgi Make Rr-20100 Compressor #*. Spring Plate For M/s Elgi Make Rr-20100 Compressor Of Three Phase Locomotive As Per M/s Elgi Part No.-070300230 (l.p. Valve) [ Warranty Period: 30 Months After The Date Of Delivery ] ] 2025-07-21
India Construction Of School Building With Six Class Rooms And X0d Two Individual Toilet Blocks For Girls And Boys At Paiyanoor Govt. Hr. Sec. School Under Maps Csr Activities. 2025-07-21
India Supply Of Pu Sealant With Packing Volume 600ml #*. Supply Of Pu Sealant With Packing Volume 600ml Of Make/brand: Henkel (teroson Pu 8590) Or 3m Or Sika (sikaflex) Or Mccoy Soudal (soudaflex 621). Note: 50 Nos May Be Supplied Partly As And When Demanded By 2025-07-21
India Supply Of Overhauling Kit For Lru Control Portion 16 Pipe (16-cp) Valve To Kbil Part No.787556-2004 Of Micro Processor Controlled Based Air Brake System For Ccb 2.0 Of Hhp Loco's #*. Overhauling Kit For Lru Control Portion 16 Pipe (16-cp) Valve To Kbil Pa 2025-07-21
India Supply Of Porcelain Stay Arm Insulator R.i 6000-2 (1050mm Cd) As Per Conforming To Specification Number: Ti/spc/ohe/ins/0071 [04/2022]. [ Warranty Period: 30 Months After The Date Of Delivery ] ] 2025-07-21
Whats app