Filter Search


Asia


Location Summary Deadline
-Qty-:-1
>India
-Qty-:-1
>Tender Invited For Job Contract For Sample Collection For Chemistry Laboratory At Ongc Hazira Plant For The Period Of 3 Years
Qty : 1
-Qty-:-1
>2025-09-08
India Cp Drain Plug Protection Guard .#* Cp Drain Plug Protection Guard As Per Drawing No. M/els/rpm/sk-292 Alt-1. [ Warranty Per iod: 30 Months After The Date Of Delivery ] ] 2025-09-08
India Supply Of 82052712: Unbranded Povidone Iodine Ointment Ointment Brand: Na (detailed Description/specification As Per Product # 1 Of Gem Contract No. Gemc-511687757906712 Dt.10/07/2025) 2025-09-08
India Ms Wire For General Engg. Purpose Of 1.25 Mm Dia. .#* Ms Wire For General Engg. Purpose Of 1.25 Mm Dia. Drg. No.--------- Material And Specific ation: Is:280/2006(rev. 4), Amend. No. 1 Of August 2009, The Wire Shall Be Hot Dipped Galvanised (lig ht Coated 2025-09-08
India Supply And Installation Of Rail Profile Measuring Equipment. .#* Supply And Installation Of Rail Profile Measuring Equipment (miniprof) With Pda/tablet With P rogramme As Per Rdso Specification No. Tm/sm/323 (rev 01 Of 2018) Or Latest Up To The Date Of Te 2025-09-08
qty:1
>India
qty:1
>Tender Invited For Standard Tools Materials For I-level Maintenance Facility Of Missiles
qty:1
qty:1
>2025-09-08
-Qty-:-1
>India
-Qty-:-1
>Tender Invited For Dslr Camera Lens (q3)
Qty : 1
-Qty-:-1
>2025-09-08
qty:3535
>India
qty:3535
>Tender Invited For Cambric Cotton Undyed 114/115 Cm Wide Specn Is: 5088-1982 (1-st Revision) With Amendment No 1, May’
qty:3535
qty:3535
>2025-09-08
India Tender Invited For Clutch Slave Cylinder, Assy Mastercylinder, Assy Cable Complete, Relay, Armature, Armature Assy, Master Cylinder Repair Kit, Repair Kit For Slave Cylinder, Bearing Bush, Bush Bearing, C E Bush, Field Coil Assy, Repair Kit, Cover Assy 2025-09-08
India Supply Of Heavy Duty Storage Racks And Supply Of Single Mode Five Core Units. #*. Heavy Duty Storage Racks As Per Drawing No. Cwm/mech/ju/sketch-1417. [ Warrantyperiod: 30 Months After The Date Of Delivery ] ]supply Of Single Mode Five Core Units With Sid 2025-09-08
Whats app