Filter Search


Asia


Location Summary Deadline
India Supply Of Unf Asr Pneumatic Cont Eqpt For Lhb #*. Supply Of Control Equipment For Air Suspension System For Lhb/eog Coaches To Material Schedule No. Icf/sk-10-2-674,issue Status-01, Rev-00 [ Warranty Period: 30 Months After The Date Of Delivery ] 2026-03-31
Bangladesh Contract Award For: 2k Preventive Maintenance Of 5 Nos. Gas Generator Of Swtp-2, Dwasa contract Value (taka): 483700.014 no. Of Tenders/proposals Sold: 2 no. Of Tenders/proposals Received: 2 tenders/proposals Responsive: 2 date Of Notification Of Awa 2026-03-31
India Supply Of 25160023: Kit For Pressure Regulator Assy For Vcb Type Bvac 25.10 Of M/s Aal & M/s B.t. M/s.aal Pt No. Sg 300147r0001. M/s Bombardier Pt No. Sg 300147-r1. Kit Consist Of 04 Items. Accepted Make: Aal 2026-03-31
India Supply Of Slrd Roof, Sidewall And End Wall #*. One Coach Set Of Roof, 3mm Side Wall And End Wall For Lwlrrm Coaches With Noise Reduction Feature 1)roof Complete To Drg. No. 53816018, Alt 'c' - 1 No. 2)roof End Part Complete To Drg. No. 83416016, Alt 'a'-1 2026-03-31
India Supply Of Rmpu Type-ii For Lwlrrm #*. Supply Of Roof Mounted Ac Package Unit Rmpu Type-ii For Lhb Power Car,consisting Of Rmpu With R407-c Refrigerant -01 No. To The Rdso Specification No. Rdso/pe/spec/ac/0061-2005 Rev-1 And Microprocessor Controller Unit 2026-03-31
India Supply Of Control Arm Set For Lhb Bogies #*. One Coach Set Of (1)control Arm Lower Right To Drg No.aaa02028 Alt'd' - 4 Nos (2)control Arm Lower Left To Drg No. Aaa02027 Alt'd' - 4 Nos (3)contorl Arm Upper To Drg No Aaa02026 Alt'j' - 8 Nos (these Three Ite 2026-03-31
India Custom Bid For Services For - Watchman 2026-03-31
India Supply Of Slrd Roof, Sidewall And End Wall #*. One Coach Set Of Roof, 3mm Side Wall And End Wall For Lwlrrm Coaches With Noise Reduction Feature 1)roof Complete To Drg. No. 53816018, Alt 'c' - 1 No. 2)roof End Part Complete To Drg. No. 83416016, Alt 'a'-1 2026-03-31
India Supply Of 10125058: Srphc065230-lorlatinib 100 Mg Tab Unit:tab 2026-03-31
India Kannamangalam Gp Pro 369 Construction Of Vk Madu Anganwadi Center No 48 In Ward 07 2026-03-31
Whats app