Filter Search


Asia


Location Summary Deadline
India Master Service Agreement With Tata Consultancy Services 2026-03-31
India Linear Lights Under Drro 2026-03-31
India Supply Of 29120032: S.s.tube O/d 38 .1 Mm (1 1/2")x 3.404 Mm W.t. X 6 Mtr. Lg.(weight/mts=2.93 Kg) Cat No.t/9/0002b As Per Specn. Clw/ms/3/029 Alt-10 2026-03-31
India Electrical Equipments At Mlif 2026-03-31
India Supply Of 92111002: High Speed Diesel Oil Conforming To Is 1460-2000, Amendment No.1 Jan2003/ 4th Revision, (euro Iii) Method Of Testing As Per Astm D 4294/ip336 2026-03-31
Bangladesh Contract Award For: Spares For Viral Vaccine Laboratories contract Value (taka): 3815000.000 no. Of Tenders/proposals Sold: 3 no. Of Tenders/proposals Received: 3 tenders/proposals Responsive: 1 date Of Notification Of Award: 05-oct-2025 26-oct-2025 2026-03-31
India Supply Of 335010410014: Wheel Set Bearing (uic Taper Roller Bearing) For Dia 130mm Axle To Drg.no. Lwscwac-0-2-006 Item-01, Alt "e"---- And Fiat Specn. No. Ts 17.565.100.ver.01 & Ts 17.565.103.ver.00 Or Rdso Spec No. Rdso/20 2026-03-31
India Supply Of Under Frame Complete For Amrit Bharat #*. Under Frame Complete For Lgs/eog/ay Coaches To Drg No- 67011001 Col.i, Alt "k". And Icf/md/spec-147, Issue Status-01,rev-02, With Amendment.no-01. Special Condition : Packing Condition As Per Drg No.icf/ 2026-03-31
India Supply Of Bogie Frame Arrangement For 1600 Hp Ac-ac Dmu/dpc Coaches #*. Bogie Frame Arrangement For 1600 Hp Ac-ac Dmu/dpc Coaches To Drg.no. (531)dmu/dpc/ss-0-3-001 Col.1 Alt 'k'. Bogie Frame To Be Supplied Without Nylon Bushes Wherever Applicable And Rds 2026-03-31
India Side Frame Friction Liner .#* Side Frame Friction Liner To Drg. No. Rdso[w]-sk-69594, Alt.-38, Item No. 7. Material And Sp ecification As Per Drawing. [ Warranty Period: 30 Months After The Date Of Delivery ] [quantity Tolerance (+/-): 5 %age , Item Categ 2026-03-31
Whats app