Filter Search


Asia


Location Summary Deadline
Bangladesh Contract Award For: Improvement Of Piroldanga (shibrampur) Jame Mosque Under Dhamoirhat Union [latitude: 25.1371129 Longitude: 88.8723906] Under Dhamoirhat Upazila, District: Naogaon. contract Value (taka): 474999.050 no. Of Tenders/proposals Sold: 26 2025-09-16
Singapore Contract Awarded For Invitation To Quote For Rental Of High Tentage At Alexandra Primary School 60 Days 30 Days 24,850.00 (sgd) nanyang Inc Pte. Ltd. 16 Jun 2025.invitation To Quote For Rental Of High Tentage At Alexandra Primary School 2025-09-16
India On Load Change Over Switch .#* On Load Change Over Switch ( 24v Bsi ) 250 Amp , 4 Pole 415v , 50 Hz Ac - 23a Confirm To I ec 947-3 With Steel Enclosure. Make :- Siemens , Standard, Havells Or Eq. [ Warranty Period: 30 Months after The Date Of Delivery ] [ 2025-09-16
India Dhule/dmc/ Wd/ Dmc Fund/ 25 / 2-3 /2020-21 Constructing Asphalt Road From Santaji Chouk To Trikoni Garden Pr. No. 11 Dmc Dhule. (2019-20) 2025-09-16
India Tender Invited For Set Consists Of 3 Items For Fiba Modification: (1)male Connector 1od X 3/4 Bspt(m) As Per Icfdrawing Number Icf/std 3-5-016, Alt.d, Item No. 4 To Specification Icf/md/spec-166 #*. Set Consists Of 3 Items For Fiba Modification: (1)male C 2025-09-16
India Contract Awarded For : Epp0157 - Gas & Oil Boiler Servicing, Maintenance, Repairs & Upgrade this Contract Was Awarded Via Eastern Procurement Heating Servicing, Repairs And Installations Framework. It Is For The Servicing, Maintenance, Repairs & Upgrades 2025-09-16
China Contract Awarded For Real Estate Development Project Of Gz508 Plot segment Number: Hjffjsz2024090005003 winning Bid Period (days): 810; project Location:.real Estate Development Project Of Gz508 Plot 2025-09-16
India Pwd/kalwan/tnno_9_25 2025-09-16
India Striking Plate Complete .#* Striking Plate Complete Mc Bolster As Per Drawing Dc/emu/m-0-5-009 Alt H/3 Attached. [ War ranty Period: 30 Months After The Date Of Delivery ] [quantity Tolerance (+/-): 5 %age , Item Category : Normal , Total Po Value Variati 2025-09-16
India 12 Mm Thick Compensating Ring .#* 12 Mm Thick Compensating Ring For Primary Suspension Of Icf Drg.no.aaa01031 (fiat Bogie Ref. Drg. No. 1227229_06) For Lhb Coaches. [ Warranty Period: 30 Months After The Date Of Delivery ] ] 2025-09-16
Whats app