Filter Search


Asia


Location Summary Deadline
India Supply Of 10125058: Srphc065230-lorlatinib 100 Mg Tab Unit:tab 2026-03-31
India Kannamangalam Gp Pro 369 Construction Of Vk Madu Anganwadi Center No 48 In Ward 07 2026-03-31
India Contract For Providing Catering Services And Maintenance Of Staff Canteen At Main Office Building (mob) And Additional Office Building (aob) Of Reserve Bank Of India, Nagpur 2026-03-31
Bangladesh Construction Of 250mm Dia 500 Meter (each) Length (extension) Upvc Burried Pipe Line. Pipe, Fittings And Riser Valve To Be Supplied By The Authority. Total Length 5000 Meter. 2026-03-31
India Supply Of Slrd Roof, Sidewall And End Wall #*. One Coach Set Of Roof, 3mm Side Wall And End Wall For Lwlrrm Coaches With Noise Reduction Feature 1)roof Complete To Drg. No. 53816018, Alt 'c' - 1 No. 2)roof End Part Complete To Drg. No. 83416016, Alt 'a'-1 2026-03-31
Bangladesh Contract Award For: At Ssae/works/kyto Section: Construction Of Bank Protection Wall (1200 Feet Length) At Km 361/0-3 To 362/0-1 And Repairs To Cess & Bank By Earth Filling From Railway Land Including Of Ballast Wall At Both Approach Of Bridge No-229 (3x4 2026-03-31
Bangladesh Supply Of 250mm Outer Dia Upvc Pipe And Moulded Fittings. 2026-03-31
India Supply Of Steel Blooms 300 Mm Sq For Forging Lhb/fiat Bogie Axles To Irs R-16/95 As Per Rwf Secification No. Rwf/m/specn-1/128/2021 Alt.- Nil. Specn: Rwf/m/specn-1/128/2021 Alt.- Nil] 2026-03-31
India Supply Of Underframe Arrangement For Emu Trailer C Coach #*. Underframe Arrangement For Emu Trailer C Coach To Drg. No.(573)icf/mrvc/c/bt-1-1-001, Alt 'g'. The Manufacturing Facility As Per Icf/md/spec-147, Issue Status-01, Rev.02 With Amendment No.01. Sp 2026-03-31
India Valve-1/4 Relief .#* Valve-1/4 Relief As Per Drg.no. 40047147 Alt A Specn: Purchase Specification No- Misc:616 rev.nil [ Warranty Period: 30 Months After The Date Of Delivery ] [quantity Tolerance (+/-): 5 %age , Item Category : Normal , Total Po Value Va 2026-03-31
Whats app