Filter Search


Asia


Location Summary Deadline
India Providing Cc Roads And Cc Drains At East Colony In Ward.no.93 2025-07-31
India Supply Of Section Insulator Assy #*. Section Insulator Assy.[ri-6100] Specification Eti/ohe/27(8/84)rev-1 Or Latest. [ Warranty Period: 30 Months After The Date Of Delivery ][quantity Tolerance (+/-): 5 %age , Item Category : Normal , Total Po Value Varia 2025-07-31
India Shaping Machine As Per Is 10949 (q3) 2025-07-31
India Grey Water Management ( H.f.c And V.f.c ) Ramanathpur Mouja At Kumirmora Gp. 2025-07-31
India Supply Of Crimping Socket #*. Crimping Socket To Drg.no.icf/sk-7-2-528/item-24, Alt 'z'. [ Warranty Period: 30 Months After The Date Of Delivery ] ] 2025-07-31
India Supply Of 35109130: Split Ring Complete To Icf Drg No.emu /m-0-6-012 Alt-r/nil 2025-07-31
India Raising Of Existing Low Level Cc Road And Side Drain From Badam Chettu To Srinivasa Mahal, Hill Area In 51 Division, Circle-i Area (1st Call) 2025-07-31
India Supply Of Spring Loaded Switch For Copmressor Used As Blcp (pos No. Type- Sbm-) Type - F/tuso/21/22/20 #*. Spring Loaded Switch For Copmressor Used As Blcp (pos No. Type- Sbm-) Type - F/tuso/21/22/20 As Per Clw Specification No. Clw/es/3/0075 Or Latest An 2025-07-31
India Contract Awarded For Provision Of Debt Collection Services contract Amount: 0 date Of Award: 2024-07-15.provision Of Debt Collection Services 2025-07-31
qty:50
>India
qty:50
>Supply Of Tubing Tong, Snap On, 2 7/8 Tubing
qty:50
qty:50
>2025-07-31
Whats app