Filter Search


Asia


Location Summary Deadline
India Supply Of Knuckle Of Cbc #*. Knuckle Of Cbc Frontier Drg. No. Fasl/tlc/k/0506 As Per Rdso Spec.no. Rdso/2011/cg-03 Rev. 03 As Per Drg.no. Drg. No. Fasl/tlc/k/0506 Specn: Rdso Spec.no. Rdso/2011/cg-03 Rev. 03 [ Warranty Period: 84 Months After The Date Of 2025-08-07
India Supply Of Control Rod Of Mechanism Assly M/s Sil Pt.no. S0221112401 Or M/s Gsec Drg. No. Gsec/panto/080 Or M/s Contransys Pt.no. C01740 Or M/s Concept Order Ref.no. 0102133 Conforming To Rdso Spec No. Rdso/2008/el /spec/0066 Rev.0 Dated 20.06.2008 And Ame 2025-08-07
India Modified Trunion Assembly (rh And Lh) Rdso Drg. No. Skel-4559 In 4 Sheets, Sheet 1/4alt.1, Sheet 2/4 Alt.1, Sheet 3 /4 Alt. 0 And Sheet 4/4 Alt.0 [ Warranty Period: 30 Months After The Date Of Delivery ][quantity Tolerance (+/-): 5 %age , Item Category : 2025-08-07
India Supply Of Wheel Tag (axle Box Cover) . #*. Wheel Tag (axle Box Cover) To Drg. No.- G/sd3- 1312, Ref. Drg. No.- C/ab-152/c [ Warranty Period: 30 Months After The Date Of Delivery ] ] 2025-08-07
India Supply Of Rubber Stopper For Body Side Door #*. Rubber Stopper For Body Side Door To Drg.no.icf/std-4-3-004, Alt 'c' Or Latest, Item-1. [ Warranty Period: 30 Months After The Date Of Delivery ][quantity Tolerance (+/-): 5 %age , Item Category : Normal , T 2025-08-07
India Supply Of Dirt Collector Assembly . #*. Dirt Collector Assembly To Rdso Drawing No. Wd-92051, S-03, Alt.4.and Rdso Specification No. 02-abr-02 With Amendment No.4 Of Sep.2016. [ Warranty Period: 30 Months After The Date Of Delivery ][quantity Tolerance (+ 2025-08-07
India Supply Of Blower Motor Complete Without Impeller For Mvmt Application As Per Clw?s Specn. No. Clw/es/b-14/c #*. Blower Motor Complete Without Impeller For Mvmt Application As Per Clw?s Specn. No. Clw/es/b-14/c. [ Warranty Period: 30 Months After The Date 2025-08-07
India Supply Of High Tensile Tight Loco Transition #*. High Tensile Tight Loco Transition Center Buffer Coupler Suitable To Fit Pocket Sized For Wap-7 & Wap-5 Electric Locomotive As Per Rdso Specn.no.mp.0.41.00.05( Rev.00) July,04." [ Warranty Period: 30 Months 2025-08-07
India Concreting Of Transformer Padi Elavunkal Road (lane) In Ward 3 2025-08-07
India Sthamcotta Gp Project No. 41/24-25-kuttiyil Mukku Pevilamukkuroad Concreting In Ward 4 2025-08-07
Whats app